White Glove-CS 940726COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
July 26, 1994
Engineering Depart~
Public Works Staff
Development Fees for White Glove Express Addition
The following fees
referenced project.
Water Impact Fee:
1 2"
1 1 1/2"
should be assessed and collected on the above
Domestic Meter/s = 8 ESU's
Irrigation Meter/s = 5 ESU's
Total 13 ESU's @ $650.00 ea = $ 8,450.00
100% due prior to Council approval of the final plat.
Wastewater Impact (City)
1 - 2" Domestic Meter/s =
Total 8 ESU's @ $450.00 ea =
8 ESU's
$ 3,600.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $100.00 each = $ 200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections @ $100.00 each = $
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 2" Domestic Meters @ $189.10 ea = $ 189.10
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1 1/2" Irrigation Meter/s @ $129.10 ea
- Fireline Meter/s @ $ ea
100% due prior to issuance of water meter/s.
= $129.10
= $
Water Meter Deposit (Multi-Family or Non-Residential)
2 Meters @ $35.00 ea = $ 70.00
100% due prior to issuance of water meters.
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined: