White Glove-CS 940428COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
April 28, 1994
Gary Sieb, Director of Planning & Community Services
Steven G. Goram, Director of Public Works
White Grove Express, Final Plat
Plan Review Comments
3.
4.
5.
6.
7.
8.
9.
Contact Rick Wieland with Parks and Recreation
prior to disruption of irrigation service along
Road (Sheet C-1 of Construction Plans).
(462-8495)
Denton Tap
Install 4' diameter manhole instead of cleanout at Station
3+31.61 (Sheet C-2 of Construction Plans).
Proposed 20' drainage easement through property needs to be
private. (Sheet C-2 of Construction Plans).
Delete meter installation details for FM and DC meters (Sheet
SD-19 of Standard Construction Details).
Require standard construction detail for 2" meter (Sheet SD-19
of Standard Construction Details).
Landscape and irrigation plans need to conform to Streetscape
Plan.
Water and waste water impact fees to be assessed (final plat
sheet).
Irrigation controller will have freeze protector, rain sensor,
and surge protection device.
Landscape and irrigation plans are required to be included in
the final construction plans.
SGG/bc
cc: Kenneth Griffin, Assistant City Manager/City Engineer
Central File
WHITEGR.SG