Loading...
White Glove-CS 940407DATE: TO: FROM: RE: COPPELL PUBLIC WORKS MEMORANDUM April 7, 1994 Planning and Community Services Public Works Staff Comments Regarding the White Glove Addition Reestablish the left turn lane plant/landscape material as per City Park and Recreation Manager. Trees will be removed in a manner where they can be salvaged and reused. It is the City's option to transplant the materials and the developer must notify the Parks and Recreation Division prior to construction. On-site storm system to be private as well as drain inlet at Sta. Al. Explain on-site fire hydrant in public dedicated easement. Can the fire hydrant be in the right-of-way within the easement? The fire hydrant can be 150' from the farthest corner of the building. Tap domestic water hydrant directly off main according to Fire Department specifications. Contractor should verity before construction, that Lone Star Gas has been notified and approval received from Lone Star Gas for the sanitary sewer parallel to the 24" high pressure line. The proposed cleanout at Sta 3 + 31.61 does not meet the maximum standards of the City of Coppell Standard Details which allows cleanouts to be separated from the manhole. The vacuum operation mt, st be fully contained and a decibel level be taken prior to commencement of construction to be on file with the Planning Department and that the decibel reading not be greater than 55 DBC during full operation of the facility, that a screening wall is to be provided by the Applicant on the east side of the property as shown on the site plan and if the level is above 55 that the Applicant take necessary precautions. 10. \dm The driveway has a divider for ingressing and egressing traffic and that the Applicant will agree to take necessary alterations to the median cut deemed by Engineer. Additional landscaping should be added at the rear to buffer the sound from the adjacent neighborhood subject to the site plan. cc: Engineering Dept. Central File PLANS.WHITEG