Loading...
Vista Point II L5-CS050722DEVELOPMENT FEES PI iINEER: )RIGINATION DATE: Vista Point II, Lot 5 (Bank of Texas) Schnitz & Sewell 7/22/2005 SENT ASSESSMENT ASSESSEDFEE AMOUNTPAI£ DATE Water Impact Fee $3,640.00 Wastewater Impact Fee $1,400.00 Park Fee n/a Roadway Impact-Zone $3,535.31 $3,535.31 rb 8/10/2005 Street Sign Street Light Construction Inspection $3,466.00 $3,466.00 rb 8/23/2005 EG or Bore Permit 9/12/2005 Overtime Inspection $324.00 Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final inspection $100.00 $100.00 di 10/17/2005 $50.00 $50.00 di 10/17/2005 $126.67 $140.78 di 10/1712005 $211.72 $204.34 di 10/17/2005 $30.00 $30.00 di 10/17/2005 $30.00 $30.00 di 10/17/2005 $50.00 $50.00 di 10/17/2005 []Subtotal to Eng. TOTALS $7,325.31 $7,001.31 $324.00 Total Fees Fees Paid Amount Owed $12,963.70 $7,606.43 $5,357.27 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.