Vista Point II L5-CS050722DEVELOPMENT FEES
PI
iINEER:
)RIGINATION DATE:
Vista Point II, Lot 5 (Bank of Texas)
Schnitz & Sewell
7/22/2005
SENT ASSESSMENT
ASSESSEDFEE AMOUNTPAI£
DATE
Water Impact Fee
$3,640.00
Wastewater Impact Fee
$1,400.00
Park Fee n/a
Roadway Impact-Zone
$3,535.31 $3,535.31 rb 8/10/2005
Street Sign
Street Light
Construction Inspection
$3,466.00 $3,466.00 rb 8/23/2005
EG or Bore Permit
9/12/2005 Overtime Inspection
$324.00
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final inspection
$100.00 $100.00 di 10/17/2005
$50.00 $50.00 di 10/17/2005
$126.67 $140.78 di 10/1712005
$211.72 $204.34 di 10/17/2005
$30.00 $30.00 di 10/17/2005
$30.00 $30.00 di 10/17/2005
$50.00 $50.00 di 10/17/2005
[]Subtotal to Eng.
TOTALS
$7,325.31 $7,001.31 $324.00
Total Fees Fees Paid Amount Owed
$12,963.70 $7,606.43 $5,357.27
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.