Loading...
Vista Ridge 1D-CS050509 (2)DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIG NAT ON DATE: Vista Ridge Addn, Lot 5, Block D (The Plaza) Dowdey, Anderson & Associates 5/9/2005 SENT ASSESSMENT ASSESSED FEE AMOUNT PAl[: DATE 5/9/2005 Water Impact Fee $5,180.00 Wastewater Impact Fee $2,240.00 Park Fee n/a Roadway Impact-Zone $21,690.84 $21,690.84 rb 6/22/2005 Street Sign Street Light Construction Inspection to be calculated EG or Bore Permit Overtime Inspection Water Tap Inspection $200.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $211.72 Water Meter (Fire/Irrig) $6,954.14 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $90.00 Utility Final Inspection $50.00 $100.00 di 7/11/2005 $6,742.42 di 7/11/2005 $60.00 di 7/11/2005 I~Subtotal to Eng. $21,690.84 $21,690.84 $0.00 TOTALS Total Fees Fees Paid Amount Owed $36,696.70 $28,593.26 $8,103.44 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.