Vista Ridge 1D-CS050509 (2)DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
ORIG NAT ON DATE:
Vista Ridge Addn, Lot 5, Block D (The Plaza)
Dowdey, Anderson & Associates
5/9/2005
SENT ASSESSMENT
ASSESSED FEE AMOUNT PAl[: DATE
5/9/2005 Water Impact Fee
$5,180.00
Wastewater Impact Fee
$2,240.00
Park Fee n/a
Roadway Impact-Zone
$21,690.84 $21,690.84 rb 6/22/2005
Street Sign
Street Light
Construction Inspection to be calculated
EG or Bore Permit
Overtime Inspection
Water Tap Inspection $200.00
Wastewater Tap Inspection $50.00
Water Meter (Domestic) $211.72
Water Meter (Fire/Irrig) $6,954.14
Meter Deposit (Domestic) $30.00
Meter Deposit (Fire/Irrig) $90.00
Utility Final Inspection $50.00
$100.00 di 7/11/2005
$6,742.42 di 7/11/2005
$60.00 di 7/11/2005
I~Subtotal to Eng.
$21,690.84 $21,690.84 $0.00
TOTALS
Total Fees Fees Paid Amount Owed
$36,696.70 $28,593.26 $8,103.44
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.