Loading...
Vista Ridge 3G-CS011026 T H £ · C I T Y , 0 F COl'FELL October 26, 2001 David Littleton, P.E. Halff Associates 8616 Northwest Plaza Drive Dallas, Texas 75225 RE: Vista Ridge Addition Lot 3R Block G Fee Assessment Letter Dear Mr. Littleton: Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $84,724.86 and forward the check to the Engineering Department along with a copy of the Fee Assessment Table. This amount is the portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please feel fi'ee to contact me at your convenience. Director of Engineering/Public Works CC: Jennifer Armstrong, Finance Director Khonda Brothers, Engineering Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: I~tsta Ridge Addition Lot 3R Block G Date: lO~6,'2o01 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $ $, 180.00 (100% due at Issuance of Bui!din~ Permit) Water Tap Inspection Fee $250.00 {100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $205.28 (100% due at Issuo~ee of Water Meter) Water Meter Fee 0rrigationfFireline) $6,482.60 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 {100% due at Issuance of Water Meter) Irdgntion/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,240.00 {I 00% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Iss, mnee of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) $0.00 ' $0.00 Park Fee (100% due prior to Council Approval) Roadway Impact Fee $84,724.86 $84,724.86 '(100% due prior to Council Approval) information not Available Street Light Fee (100% due prior to Acceptance of Project) ~ Information not Available Street Sign Fee (100% due prior to Acceptance of Project) ~ Construction Inspection Fee nformation not Available (100% due prior to Start of Construction) ~ I'OTAL $99,332.74 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $84,724.86 DEVELOPMENT FEE WORKSHEET PROJECT: kYsm Ridge Addition lot 3R Block G DATE: 10/26/2001 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fimline Meter(s): I - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's 3 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's ~} $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 5 Connections ~ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due pdor to issuance of meter) Domestic Water Meter Fee: Total ~. I Domestic Meter(s) ~l $205.28 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) ~ $205.28 Total #: 0 Additional Irrigation Meter(s) ~} $0.00 Total 0: 3 Fireline Meter(s) ~} $2,092.44 (100% due pdor to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) ~} $30.00 ea. ( 100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due pdor to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 (Due prior to issuance of building permit) ~i $280.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections ~} $50.00 ea. (100% due pdor to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots ~ $50.00 ea. (100% due prior to issuance of building permit) $5,180.00 $250.00 $205.28 $205.28 $6,277.32 $30.00 $120,00 $2,240.00 $50.00 $50.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 0 Single-family ~ $0.00 per lot Multi-family ¢} $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $84,724.86 Information not Available Street Sigu Fees: Assessed for sJgnage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering DepertmenL (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Vista Ridge ~_,~!~on Lot 3R Block G 10/26/2001 ROADWAY IMPACT FEE: ~ervic~ Area * 2 ~ategory ** Office F.~nd Use ** General Office Bldg. ~llildin~ ~ ($1~ 70~781 9evelopment Units ** 70.78 Vehicle Miles per Development Unit ** 3.99 ?ee per Vehicle Mile *** $300 Roadway Impact Fee due -- (Development Units) x Vehicle Miles per Development unitI x ~Fee per Vehicle Mile) = $84,724.86 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)