Waters Edge P2-CS 940104COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: 1/4/94 Ken Griffin, P.E., ~y Engineer Public Works Staff Development Fees for~s E~ge~ The following fees should be assessed and collected on referenced project. the above Water Impact Fee: 20 - 5/8" x 3/4" Domestic Meter/s = 20 ESU's This ass4essment does not include irrigation meter fees and impact information was not available. Total 20 ESU's @ $650.00 ea = $13,000.00 100% due prior to Council approval of the final plat. wastewater Impact 20 lOO% (City) - 5/8" x 3/4" Residential Meters = 20 ESU's Total 20 ESU's @ $450.00 ea = $4,500.00 due prior to Council approval of the final plat. Water Tap Inspection Fee 20 Connections @ $100.00 each = $2,000.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 20 Connections @ $100.00 each = $2,000.00 100% due prior to issuance of building permit. Development Fees Page 2 Utility Final Inspection Fee 20 lots @ $50.00/lot = $1.000.00 100% due prior to issuance of building permit. Water Meter Fee (Lots) 20 - 5/8" x 3/4" Residential Meters @ $22.25 ea = $ 445.00 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) - 5/8" x 3/4" Irrigation Meters @ $22.25 ea Total Information not available. 100% due prior to issuance of water meters. = $ $ Water Meter Deposit Residential - 20 meters @ $30.00 ea = $ 600.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 3 Park Fee 2O Residential Lots at $150.00 each = $ 3,000.00 Units (Multi family) at $75.00 each = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works DEVFEES.HLP Development Fees Page 4 STREET SIGN ASSESSMENT for Waters Edge Phase II Addition The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 2 $127.08 Yield $58.56 Stop $65.12 Street Name $11.60 2 23.20 Stop & Street Combo $96.85 OTHER TOTAL 4 $ 150.28 * Cost breakdowns may be obtained from Public Works by written request. FEES.HLP.WTRSEDII Revised 12/15/92