Waters Edge P2-CS 940104COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
1/4/94
Ken Griffin, P.E., ~y Engineer
Public Works Staff
Development Fees for~s E~ge~
The following fees should be assessed and collected on
referenced project.
the above
Water Impact Fee:
20 - 5/8" x 3/4" Domestic Meter/s = 20 ESU's
This ass4essment does not include irrigation meter fees and impact
information was not available.
Total 20 ESU's @ $650.00 ea = $13,000.00
100% due prior to Council approval of the final plat.
wastewater Impact
20
lOO%
(City)
- 5/8" x 3/4" Residential Meters = 20 ESU's
Total 20 ESU's @ $450.00 ea = $4,500.00
due prior to Council approval of the final plat.
Water Tap Inspection Fee
20 Connections @ $100.00 each = $2,000.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
20 Connections @ $100.00 each = $2,000.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee
20 lots @ $50.00/lot = $1.000.00
100% due prior to issuance of building permit.
Water Meter Fee (Lots)
20 - 5/8" x 3/4" Residential Meters @ $22.25 ea = $ 445.00
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
- 5/8" x 3/4" Irrigation Meters @ $22.25 ea
Total
Information not available.
100% due prior to issuance of water meters.
= $
$
Water Meter Deposit
Residential - 20 meters @ $30.00 ea = $ 600.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 3
Park Fee
2O
Residential Lots at $150.00 each = $ 3,000.00
Units (Multi family) at $75.00 each = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
DEVFEES.HLP
Development Fees
Page 4
STREET SIGN ASSESSMENT
for Waters Edge Phase II Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 2 $127.08
Yield $58.56
Stop $65.12
Street Name $11.60 2 23.20
Stop & Street Combo $96.85
OTHER
TOTAL 4 $ 150.28
* Cost breakdowns may be obtained from Public Works by written
request.
FEES.HLP.WTRSEDII
Revised 12/15/92