Loading...
Walgreens-CS 970520The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 Bill Anderson, P.E. Dowdey, Anderson & Associates, Inc. 162~0 Dallas Pkwy., Suite 100 Dallas, TX 7S248 walareem Development Fee As~mment May 20, 1997 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $9,969.84 and forward to the Finance Depaxtment along with a copy of the Fee Assesauent table. This amount is a potion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offiee so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Deparlment will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Ke ~n~th M. Griff'm, P.E. Director of Engineering & Public Works Jennifer Armstrong, Fillal~e Director Doug Stevens, Engineering Technician Greg Jones, Chief Building Official C-ary Sims, Dir. Leisure Services DEVELOPMF NT FEE TABLE Project: Walgreens Date: 5/20/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,625.00 $5,625.00 (100% due prior to Council A~roval) Water Tap Inspection Fee $150.00 (100% due at Is~mnce of Water Meter) Water Meter Fee (Domestic) $134.93 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireliue) $1,574.01 (100% due at Iss~nce of Water lVleteO Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) ' Irrigation/Fireliue Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00: (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildinvo Permit) Park Fee $0.00 $0.00 (100% due prior to Co~mc!! Approval) Roadway Impact Fee $2,094.84 $2,094.84 (100% due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of Project Street Sign Fee N/A (100% due prior to Acceptance of Project Construction Inspection Fee Need submittal of development contracts TOTAL $12,028.78 TOTAL AMOUNT DUE PRIOR TO COUNCIL A~'~-~tOVAL $9,969.84 DEVELOPMENT FEE WORKSHEET PROJECT: Walgreens DATE: 5/20/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - I 1/2 inch = 5 ESU's I - 1 1/2 inch = 5 ESU's = ESU's 1 - 6 inch = 2.5 ESU's Total #: 12.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) {All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $134.93 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: I Fireline Meter(s) @ (100% due prior to issuance of water meters) $134.93 $1,439.08 Water Meter Deposit Fee (Domestic): Total #: I Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ $450.00 ea. Wastewater Tap ln;pection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Einal Ingpection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $5,625.00 $150.00 $134.93 $134.93 $0.00 $1,439.08 $30.00 $70.00 $2,250.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For ResdentJal Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.O0 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Prelimln~-y plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $2,094.84 N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Oepartment. (2% of development cost required for private improvements) {4% of development cost required for public improvements) Need submittal of Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Wa/green~ DATE: 5/20/97 ROADWAY IMPACT Service Area * 1 Category ** Commercial Land Use ** Buildin~ Size (sq. Dev¢lopmen~ Unit~ ** Vehicle Miles per Development Unit ** Fee ~r Vehicle Mile *** Roadway Impact Fee due = (Develo~a~ent Units) x IVehicle Miles ~er DeveloDment Unit~ x ('Fee ~er Vehicle Mile) Others / Not Specified (Comme~'mi) 13,905 13.905 $19,856.34 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Aa par the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore a percentage was calculated by subtracting out the total coat in service area 1 ,~d~ou~ of ]~dlJctJoD for all projects concerning Denton Tap Rd. & Sandy Lake Rd. and divide the remainder by the total $17,761.50 cost of s the proiects n the servce area. The cacuated percenta~le s 10.65.