Waterside P1-CN 930909HOLD HARMLESS AGREEi~ENT
~ ,,5. ~-7~,~ ~ >/,7 SUBDIVISION,
t~"~; ' ' '
AC~O~EDGE ~T ~ FENCE ~ICH IS LO~TED ON ~IR PROPE
ENCRO~S O~0 T~ CI~ OF COPPE~ ' S D~GE ~~;
~D
~, ~ 0~ ~E~T~D ~ A~O~EDGE ~T IN ~E
~PAI~ OR I~RO~S ~ ~QUI~D TO BE ~E TO ~ CI~ OF
COPPE~'S D~I~GE ~ ~ICH WO~ ~QUI~ ~OV~ OF
FENCE IN O~ER TO EFFECT SUCH I~RO~NTS; ~D
~, ~ 0~ ~COGNIZE ~ AC~O~EDGE T~T SUCH FENCE
W~ INSTATJ.RD DESPITE ~O~DGE OF ~ CI~'S D~I~GE ~E~;
0~ ~B~ AGUE TO ~MO~ SUCH FENCE AT ~IR O~ COST ~D
~ON ~Q~ST B~ ~ CI~ OF COPPE~,
~ FENCE ~ON ~Q~ST B~ T~ CI~, ~N CI~ WI~ ~MO~ SUCH
FENCE ~ O~RS ~B~ I~IFY ~D MOLD ~ CI~ ~ESS FROM
A~J. C~ OF D~GE T0 ~ FENCE ~ICH ~ISE FROM ~ CITY'S
~MO~ OF SUCH FENCE ~I~ ~P~RING, INSPECTING, I~ROVING OR
~ WA~ SEEKING ACCESS TO ~ D~I~GE ~E~. ~DITIO~IJ'~,
O~RS AGUE TO ~I~SE ~ CI~ FOR ~O~LE COSTS INC~D
~MOVING T~ FENCE.
~utldtng Inspections Divtsion
BUILDING PERMIT APPLICATION
Lot: '~' B! ~o~k/ / ,_~
Description of Wo~ ~ ~ ~ne
Print or Type in a Clear, Legible Manner
Subdivision: //~ ~
Ad~:
~ew ["lAd~tion' ~ I-1 Alteration
[] Repair [] Demolition
Area of Building in Square Feet
First Floor Garage Value of Work
to be Performed
Second Floor Other
GRAY AREA FOR OFFICE USE ONLY
NOTICE ~-~
This perm/t becomca null and void if work or constxuction authorized h not coramenced ,
within 180 days, or construction on work is suspended or' abandoned for a period of 180 Zof~lrtg District, Occupancy Classification,
days at any time after work is commenced,
9-9-93
I hereby certify that I have read and examined this application and know the same to be true
and correct. All provisions of laws and o~dinances governing this type of work will be Corflffletlt$:
complied with whether specified herein or not. ~h¢ granting of a permit does not
give authority to vinlat¢ or ~ other federal,
or the
El~ctrisal Contractor Plumbing Conlrac~r
IRON FENCE
O REAR OF LOTS
21 .§7'
,447.0
44.7.0
/
/
/
TYP£
/
12'x12'
PATIO
57'- 1
$ 554 B
FF 451.6
FP 450,8
16'
TO
449,6
TC 4.49,40
44.9,9
1.32'
THE TOP OF SLAB MUST BE
S£T A MINIMUM OF 2-2x6'$
ABOVE THE HIGHEST GRADE
ELEVATION OF THE BUILDING PAD
IMP COVER