Waters Edge P2-CS 930524_The City With A Beautiful Future
1993
P,O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. bfike Garrett
Nathan D. Maier
Three North Park
Suite 300
Dallas, Texas '/5231
RE: Final Acceptance of Waters Edge
A final inspection of the above referenced project has been confirmed by representatives of the
City of Coppell subject to the various maintenance agreements.
The drainage utility and paving has been verified and is in compliance with the City of Coppell
standard r~quimments. Erosion protection will also be maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter. Maturity on the Erosion
Control Bond will be two years from this letter.
Sincerely,
Larry Davis
Construcfio~ Inspector
Steve Caxam, Director of Public Works
Keaneth M. Griffin, P.E., City Engineer
Greg lone,s, Building Official
Mark Hicks, H.C.H.
Testy Tice, Austin Paving
file/ldavi~final~cc .lu-