Loading...
Waterside P1-CS 920429The City With A Beautiful Future Mr. Richard Chapman 3010 LBJ Freeway, Ste. 1420 Dallas, TX 75~ F~alAc~tance for Sanitary Sewer Repair Only P.O. Box 478 Coppell, Texas 75019 214-462-0022 Dear Mr. Chapman: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. The sanitary sewer has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bond has been received on the repaired portion of the sanitary sewer and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (April 29, 1993). Special provisions related to the installation and repair of the water meter setters and boxes has been received. (See attached) Sincerely, ,( Larry Davis Engineering Development Inspector CLD/bd CC: Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Dale Jackson, Building Official Mr. Randy Lockhart, David Weekley Homes Mr. Mike Clark, Jones & Boyd WATFIN