Loading...
Waterside P1-CS 860721GINN, INC. CONSULTING ENGINEERS July 21, 1986 Mr. Doug Spiker Triland Development One Lincoln Centre, Suite 1000 5400 LBJ Freeway Dallas, Texas 75240 Re: Waterside Estates ! -- Final Acceptance Dear Mr. Spiker: A final inspection of the above referenced project confirmed by representatives of Ginn, Inc., M.U.D. City of Coppe11. has been %1, and the Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. As of this date, permits can be issued to start construction of home building. Commitments to the Streetscape-Landscape Ordinances should be addressed within the phase of home building. The one-year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one year from the date of this letter (7-21-87). Sincerely, Randy Fleming Chief Inspector /st cc: Ed Powell Steve Goram Dale Jackson Per Birdsall Jeff Hawkins Dayton Macatee Wayne Ginn 16135 Preston Road * Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611