Waterside P1-CS 860721GINN, INC.
CONSULTING ENGINEERS
July 21, 1986
Mr. Doug Spiker
Triland Development
One Lincoln Centre, Suite 1000
5400 LBJ Freeway
Dallas, Texas 75240
Re:
Waterside Estates ! -- Final Acceptance
Dear Mr. Spiker:
A final inspection of the above referenced project
confirmed by representatives of Ginn, Inc., M.U.D.
City of Coppe11.
has been
%1, and the
Paving and utilities have been verified and are in compliance
with the City of Coppell standard requirements. As of this
date, permits can be issued to start construction of home
building. Commitments to the Streetscape-Landscape Ordinances
should be addressed within the phase of home building.
The one-year maintenance bonds and as-built drawings have been
received from both contractors. Maturity on the bonds will be
one year from the date of this letter (7-21-87).
Sincerely,
Randy Fleming
Chief Inspector
/st
cc: Ed Powell
Steve Goram
Dale Jackson
Per Birdsall
Jeff Hawkins
Dayton Macatee
Wayne Ginn
16135 Preston Road * Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611