Loading...
Waterside E P3-CS 950816COPP~.r. UTILITIES DATE: TO: FROM: RE: MEMORANDUM August 16, 1995 Larry Davis, Construction Inspector Howard Pafford, Utilities Superintenden~ Final Walk-Through for Waterside Estates Phase III Utilities personnel performed a walk-thru on the above referenced project this morning and the following items were found to be deficient; Lot 14 Blk.H-Lot cleanout missing. Inflow coming in manhole at Mariners Ct. and Cove Dr. Lot 11 Blk. G-Water service leak. Lot 5 Blk. H-Replace meter setter. Install brass elbows on all 2" blowoffs. Main line valve missing at Parkway and MacArthur. Lot 8 Blk. G-Repour concrete pad for lot cleanout. Please ensure that each of these items are corrected prior to final acceptance of this project. HLP/hp ?)