Loading...
WA9801-CS 981029 (3)SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS Project No. 98167 Client: Date: 10/29/98 Project: I Rein No. 1 CITY OF COPPELL, TEXAS State Highway 121 Water Line From Sandy Lake Road to 675' South of Corporate Drive ENGINEER'S OPINION OF CONSTRUCTION COST Description For Furnishing and Installing 12-Inch PVC Waterline with Embedmerit For Furnishing and Installing 12-Inch PVC Waterline by other than 2 Open Cut For Furnishing and Installing 12-Inch PVC Waterline in 18dnch 3 Diameter, 3/16-inch Thick Encasement Pipe by Boring For Furnishing and Installing 12-inch PVC Waterline with Class "G" 4 Concrete Encasement 5 For Funfishing and Installing 6-Inch PVC Watedine with Embedment 6 For Furnishing and Installing 12-Inch Gate VaNe 7 For Furnishing and Installing 6-Inch Gate Valve 8 For Furnishing and Installing Standard Fire Hydrant 9 For Furnishing and Installing 2-1nch Air and Vacuum Release Valve 10 For Furnishing and Installing 6-Inch Blow-Off Valve 11 For Connecting to Existing 12-Inch Waterline 12 For Furnishing and Installing Ductile Iron FiRings 13 For Removing and Replacing Existing Concrete Pavement 14 For Removing and Replacing Existing Asphalt Pavement 15 For Removing and Replacing Existing Gravel Drive 16 For Extra Concrete for Encasemerit 17 For Extra Crashed Stone for Embedment For Furnishing, Installing, Maintaining and Removal of Erosion 18 Control Devices 19 For Furnishing, Installing and Ma'mtaining Traffic Control Devices 20 For Designing and Installing Trench Safety Systems Subtotal: Contingencies and Miscellaneous Items Total: Quantity ] Unit I 4,137 L.F. $ 40 L.F. $ Price Date: 10/29/98 By: G.C.H. I Amount I 38.00 $ 157,206.00 125.00 $ 5,000.00 33 L.F. $ 170.00 $ 5,610.00 190 L.F. $ 65.00 $ 12,350.00 60 L.F. $ 30.00 $ 1,800.00 8 Ea. $ 1,200.00 $ 9,600.00 8 Ea. $ 650.00 $ 5,200.00 8 Ea. $ 1,650.00 $ 13,200.00 2 Ea. $ 2,500.00 $ 5,000.00 2 Ea. $ 2,100.00 $ 4,200.00 2 Ea. $ 1,500.00 $ 3,000.00 2,830 Lbs. $ 1.50 $ 4,245.00 26 S.Y. $ 45.00 $ 1,170.00 25 S.Y. $ 35.00 $ 875.00 15 S.Y. $ 30.00 $ 450.00 30 C.Y. $ 85.00 $ 2,550.00 30 C.Y. $ 60.00 $ 1,800.00 1 L.S. $ I L.S. $ 7,327 L.F. $ 15% 5,000.00 $ 5,000.00 5,000.00 $ 5,000.00 1.50 $ 10,990.50 $ 254,246.50 $ 38,136.98 $ 292,383.48 USE: $ 300,000.00 Page Iofl