Waterside E P2-CS 921009DATE: TO: FROM: RE: COPPELL PUBLIC WORKS October 9, 1992 Larry Davis, Construction Inspector/A~ Rey Gonzales, Street Superintenden~ Waterside II - Follow-up Walk Through Remaining Punch List Items The punch list produced on 8/10/92 is, for the most part, complete. There are two (2) items that remain incomplete. I would like to bring these to your attention once again. Guardrail is needed at the bridge to be in compliance with Federal requirements. If this is not installed, we could be refused Federal assistance on future bridge projects the City may undertake. A barrier free ramp, consistent with the A.D.A. requirements, is needed at the Alley and Parkway Blvd. on the southwest end of the project. I have attached a copy of the Federal Regulation for your review. This regulation should provide you with enough information to require the developer to provide the rail. Please contact me if you have any questions. RG/bc STWATER.RG