Waterside E P2-CS 920810DATE:
August 10,
COPPELL PUBLIc WORKS
MEMORANDUM
1992
TO:
FROM:
RE:
Larry Davis, Construction Inspector~:,<>
ReY~G°~z~=~Street SUperintendent~
Waterside II- Walk Through Punch List
Street Division staff performed a walk through of the above
referenced project at 8:30 a.m. on 8/10/92. The following is a
list of deficiencies found at the time of the walk through:
~Intersection of MacArthur and Waterside incomplete. Needs
%-,/ to be completed and ramps need to meet ADA guideline stan-
dards.
~Coffer Dam needs to be removed.
All end of road guardrail needs to be 21" high with
reflective end of road tape as per construction standard
details.
Remove debris from in front of Line G (48" RCP). ~ ~
eck plate is bowed, needs to be corrected, cannot have
ore than a 1/4" lip at sidewalk (ADA Guidelines).
~Sewer line cleanout needs 2' x 2' blockout on Chelsea Bay.
~ All drop inlets need throat sealed (*Note: All inlets are
holding water due to what appears to be the lake level at
this time).
rdrail1Q~needed at the bridge which needs to~
istent with current Standard construction de~.
· ~ con,to,on overall project needed.
Please make sure that all the parties involved receive a copy of
this punch list.
RG/bc /