Loading...
Waterside E P2-CS 920109The City With A Beautiful Future January 9, 1992 Mr. Bill Anderson Dan M. Dowdey & Associat9 Dear Mr. And-~rso~f Enclosed is a copy of the City of Coppell Development Fee Assessment list along with a copy of the development fee calculations for Waterside Estates Phase II. Please provide a check made payable to the City of Coppell in the amount of $97,551.23 plus 2% of the construction cost, and forward it to Alan Johnson, Finance Department, along with a copy of the Fee Assessment list. In addition, please provide me with a copy of the Engineer's Estimate for this project or the contract amount for verification of the construction inspection fee. If you should have any questions, please do no hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer K~G/bl cc: ~/Steve Goram, Director of Public Works Alan Johnson, Assistant Finance Director Frank Trando, Finance Director M. Shohre Daneshmand, P.E., Civil Engineer SAND3 Date: Project: CITY OF COPPELL DEVELOPMENT FEES January 23, 1992 Waterside Estates Phase II Total Fees Park Fee Assessment $ 19,800.00 (132 lots X $150 Per Lot) (50% due at final plat approval} (50% due prior to bldg. permits issuance Water Impact Fee $ 85,800.00 (100% due prior to Council approval of final plat) Water Tap Inspection Fee $ 13,200.00 (100% due prior to issuance of building permit} Wastewater Impact Fee *$ 29,700.00 (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee $ 13,200.00 (100% due prior to issuance of building permit) Street Sign Assessment $ 1,851.23 (see attached) Street Light Assessment ** ($292.60 X .... poles) (see attached} Construction Inspection Fee $ (2% of construction cost) ;kmount Due Prior to Council Approval 9,900.00 85,800.00 $ 1,851.23 NOTE: * TOTAL AMOUNT DUE: $163,551.23 $ 97,551.23 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 97,551.23 Plus 2% Contruction Inspection Fee IF PROPERTY TO BE DEVELOPED IS IN THE COPPELL MUNICIPAL UTILITY DISTRICT #1, WASTE"WATER IMPACT FEE SHALL BE ASSESSED, BUT SHALL NOT BE COLLECTED UNTIL SUCH TIME AS AN INTERLOCAL AGREEMENT IS MADE BETWEEN THE CITY AND MUD. THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED $292.60 PER LIGHT WILL BE ASSESSED. WATER6