Loading...
Waterside E P2-CS 920127 (2) The City With A Bea~tiful(Future~ January 27, 199~ i' Mr. Bill ~derson /' I/ Dan M. Dowdey & AssoCiates ~s 16250 ~-~w~_=~ ~0 X~e: Waterside Estates Phase II ~ ~Development Fee Assessment Dear Mr. ~fSon: PUBI iE~,~,,~ JRKS · Box 478 ~pell, Texas 75019 .462-0022 Enclosed is a revised copy of the City of Coppell Development Fee Assessment list for Waterside Estates Phase II. Please disregard the previous list (dated January 23, 1992). The Wastewater Impact Fee was inadvertently omitted from that list. Please provide a check made payable to the City of Coppell in the amount of $127,251.23 plus 2% of the construction cost, and forward it to Alan Johnson, Finance Department, along with a copy of the Fee Assessment list. In addition, please provide me with a copy of the En§ineer's Estimate for this project or the contract amount for verification of the construction inspection fee. If you should have any questions, please do no hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/h~/ cc: ~Steve Goram, Di[ector of ?ublic Works Alan Johnson, Assistant Finance Director Frank Trando, Finance Director M. Shohre Daneshmand, P.E., Civil EnGineer WATER7 Date: Project: CITY OF COPPELL DEVELOPMENT FEES January 27, 1992 Waterside Estates Phase II Park Fee Assessment (132 lots X $150 Per Lot) (50% due at final plat approval) ~50% due prior to bldg. permits issuance Water Impact Fee (100% due prior to Council approval of final plat) Water Tap Inspection Fee (100% due prior to issuance of building permit) Wastewater Impact Fee (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee (100% due prior to issuance of building permit) Street Sign Assessment (see attached) Street Light Assessment ($292.60 X .... polesl (see attached) Construction Inspection Fee (2% of construction cost) Total Fees $ 19,800.00 Amount Due Prior to Council Approval $ 9,900.00 85,800.00 $ 85,800.00 13,200.00 29,700.00 $ 29,700.00 13,200.00 1,851.23 $ 1,851.23 $ $ TOTAL AMOUNT DUE: $163,551.23 $127,251.23 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $127,251.23 Plus 2% Contruction Inspection Fee THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED $292.60 PER LIGHT WILL BE ASSESSED. WATER6