Loading...
Waterside E P2-CS 930722COPPELL PUBLIC WORKS MEMORANDUM DATE: July 22, 1993 TO: Larry Davis, Construction Inspector FROM: ~ Howard L. Pafford, Utilities Superintendent RE: Waterside Estates Phase II - Walk-through Utilities personnel performed a walk through on the above referenced project this morning and the following items need to be corrected prior to acceptance: 1. Paint fire hydrant valve caps red. Paint proper letter on curbs stenciled or stamped, all letters (2) inches. Manholes (MI-I) - Red paint Mainline valve (MLV) - Blue paint Fire Hydrant Valve (FHV) - Red paint Meter Box (W) - Blue Paint Sewer Cleanout (CO) - Red paint Raise manhole to grade at Shorewood and Island Bay. Lot 1 Block E - Water service leak 5. Lot 19 Block F - Replace LOt Clean out 6. Both irrigation services need proper -~" setters with dual checks. All three blow offs need angle stops with close nipples and elbows pointed up. All manholes need an approved rain pan. 9. Lot 21 Block F - Water service off at corporation stop. Please ensure these items are corrected prior to final acceptance of the project. HLP/dm WALKTHRU.HLP/WATRSDII