Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Westbury Manor-CS 991109
,11/15/99 12:14 214 504 55?0 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL ............. D~OPMENT FEES N0,579 RPROJECT NAME: ' Westbury Manor ENGINEER: Goodwin & Marshall EVISION DATE: 11/9/1999 SENT ' ASSESSMENT ASSESSED FEE 1/7/99 Park Fee $44,975.00 1/7/99 Water Impact Fee $20,250.00 1/7/99 Wastewater Impact Fee $15,750.O0 5/28/99 Street Sign $1,~,74.93 5/28/99 Street Light $2,63340 Const Inspection (grading) $568.00 $18,165.53 1/7/99 Roadway Impact.Zone 6 $29,925.00 Street Cut Permit Overtime Inspection (2/13) Overtime Inspection (2/20) Overtime Inspection (3/20) Water Tap Inspection Water Meter (Irrigation) Meter Deposit (irrigation) 2/15/99 $60.00 2/22/99 $60.00 3/22/99 $60.00 $100.00 $28560 $60,00 AMOUNT PAID DATE $4~,975.00 1 / 15/99 $20,250.00 1 / 15/99 $15,750.00 1/15/99 $1,474.93 6/15/99 $2,633.40 6/15/99 $568.00 10/13/98 $18,165.53 1/27/99 $29,925.00 1 / 15/99 $60D0 2/26/99 $60.00 3/19/99 $60.00 4/5/99 $100.00 11/4/99 $285.60 11/4/99 $6000 11/4/99 T0talFees TOTALS $134.367.46 Fees Paid Amount Owed $134,36%46 $0.0( NOTES Prior To Construction Erosion Control Approved E.P.A.,N.O.I. Recd, Const. Plan ADproved Irrigation Plan Recd. 6/18/1999 Prior To Final AcceptanGe As Built Plan Recd, Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint. ($3,700.00)