Loading...
Waterside E P2-CS 930205 COPPELL PUBLIC WORKS ~ORANDD?4 DATE: February 5, 1993 . / TO: Doug Stevens, Engineering Tech// 11 / RE: Irrigation Fees for W~erside Estates Phase I ~ ~ should b' ass and co ecte he ove Water Impact Fee: Paid 8/4/92 2 5/8" x 3/4" Irrigation Meter/s = 2 3 - 1" Irrigation Meter/s = 7.5 ESU's ESU's Total 9.5 ESU's ~ $650.00 ea = $6,175.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee Paid 8/4/92 5 Connections 6 $100.00 each = $500.00 100% due prior to issuance of meter. Water Meter Fee (Irrigation) Paid 8/11/92 2 - 5/8" x 3/4" Irrigation Meter/s ~ $25.00 ea = 3 - 1" Irrigation Meter/s @ $65.00 = $195.00 Total $245.00 100% due prior to issuance of water meter/s. $50.00 Irrigation Meter Deposit (Paid 8/4/92) 5 meters ~ $35.00 ea = $175.00 100% due prior to issuance of water meters. mLP/dm cc: Steven G. Goram, Director of Public Works