Waterside E P2-CS 930205 COPPELL PUBLIC WORKS
~ORANDD?4
DATE: February 5, 1993 . /
TO: Doug Stevens, Engineering Tech// 11 /
RE: Irrigation Fees for W~erside Estates Phase I ~ ~
should b' ass and co ecte he ove
Water Impact Fee:
Paid 8/4/92
2 5/8" x 3/4" Irrigation Meter/s = 2
3 - 1" Irrigation Meter/s = 7.5 ESU's
ESU's
Total 9.5 ESU's ~ $650.00 ea = $6,175.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee Paid 8/4/92
5 Connections 6 $100.00 each = $500.00
100% due prior to issuance of meter.
Water Meter Fee (Irrigation) Paid 8/11/92
2 - 5/8" x 3/4" Irrigation Meter/s ~ $25.00 ea =
3 - 1" Irrigation Meter/s @ $65.00 = $195.00
Total $245.00
100% due prior to issuance of water meter/s.
$50.00
Irrigation Meter Deposit (Paid 8/4/92)
5 meters ~ $35.00 ea = $175.00
100% due prior to issuance of water meters.
mLP/dm
cc: Steven G. Goram, Director of Public Works