Loading...
WA9801-CS 981029SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone(214)361-7900 ROSS L, JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P,E. JOE R. CARTER, GARY C. HENDRiCKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 October 29, 1998 Re: State Highway 121 Water Line Royal Lane to 675 Feet South of Corporate Drive Dear Mr. G~ffin: We are enclosing two sets of construction plans and specifications for the State Highway 121 Water Line, from Royal Lane to 675 feet South of Corporate Drive. This submittal has been revised in accordance with your mark-ups and written comments, and represents a 95% complete submittal. We are returning your mark- ups of our 75% complete submittal. As you requested, we have moved the water line crossing of Sandy Lake Road approximately 15-feet west towards State Highway 121. Although this does eliminate one bend, it adds the necessity to provide an steel encasemerit pipe under Sandy Lake Road, as we are now within the State' s right-of-way of S .H. 121. Normally the State requires that the roadway bore pits be no less than 10-feet from the edge of pavement on low volume roads. In this case, our alignment will not allow for that separation distance. At this stage, we are not sure what the State' s response will be to this configuration at the intersection. As you are aware, we have requested a variance to the alignment of the water line within the State' s fight-of- way. As of this morning, we have not received a response back, so we have prepared this submittal in accordance with the State's normal utility accommodation policy. Once the final alignment issue is resolved and the plans meet with the City' s final approval, we will forward the required number of sets along with the Notice of Proposed Installation for your use in formally submitting these plans to the Texas Department of Transportation for approval. We are also forwarding these preliminary plans to the utility companies for review and comment. Enclosure Based on this submittal, our opinion of probable construction cost for this project is in the range of $300,000. We are available to discuss this project further at your convenience. Sincer o ary C. ndfi . ! r