Windsor Estates-CS010913September 13, 2001
Bryan Peck
Excel Group, Inc.
2639 Walnut Hill Ln., Suite 218
Dallas, TX 75229
RE: Windsor Estates Subdivision Fees
Dear Mr. Peck:
This letter is written as a follow-up to our conversation on September 12, 2001 in which we discussed
additional fees associated with a ltA-inch irrigation meter. During the course of our conversation the
actual number of lots developed in the Windsor Estates Subdivision came into question. Our previous
assessment of this project on November 10, 1999 calculated the impact 0~es based on only 21 lots in the
subdivision, with no assessment for an irrigation meter. Because there was some confusion over the
number of lots, I referred to the approved plat for Windsor Estates, at which time I noticed that there
were 22 residential lots on the approved plat. There are also four common areas. Because there are 22
lots instead of 21, I have revised your impact fees for this development. In addition to revising the
impact fees to reflect 22 lots, I included the two irrigation meters as we discussed. One is a 5/8-inch
meter; the other is a proposed 1 g~-inch irrigation meter.
The attached Development Fee Worksheet shows 22 domestic meters, one 1 ~,&-inch irrigation meter and
one 5/8" irrigation meter. Also attached to this letter is a Development Fee Table, which shows the
various fees due and payable on Windsor Estates, and also the amounts previously paid, and date(s) we
received those payments. The addition of one residential lot and two irrigation meters has increased
your Water Impact Fee by $3,150 and your Wastewater Impact Fee by $450. The one additional
residential lot increased your Park Fee by $1,285 and your Roadway Impact Fee by $855. In addition
to those increases based on an increase in the number of lots, I also noticed that to date, you have not
paid your Street Ligh? Assessment or your Street Sign Assessment, and an outstanding Overtime
Inspection Fee.
Based on my calculation, you have outstanding fees due at this time of $8,541.11 on the Windsor
Estates development. This amount needs to be paid prior to acceptance of this development by the City
of Coppell. Please contact this office as soon as possible to rectify this fee reassessment issue. Thank
you for your consideration of this matter.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
C,,LEI,,i N I-¥0 LLO~ELL
DEVELOPMENT FEE TABLE
Project: W'mdsor Estates Revised
Date: 9/13/'2o01
Water Impact Fee
Water Tap Inspection Fee
'-~-~er Meter Fee (Domestic)
aid 8/23/00
~a~er Meter Fee Ctrrigation/Fireline)
Water Meter Deposit (Domestic)
Irrigation~ireline Meter Deposit
Wastewater Impact Fee
~¢/astewater Tap Inspection Fee
Final Inspection Fee
~-ark Fee
Roadway Impact Fee
~ Light Fee .
100%due n'orto Acce tance of Pro'eet
Street Sign Fee
100o/~o Acce tance of Pro'ect
Construction Inspection Fee
grading paid 5/10/00
construction paid 8/25/00
overtime paid 1/17/00
overtime $120 due 1/13/01
TOTAL
AMOUNT DUE BASED ON 22 LOTS
TOTAL
FEES DUE
$12,600.00
$1,200.00
$564.74
$539.00
$161.33
$0.00
$770.00
$735.00
$60.00
$0.00
$9,900.00
$1,100.00
$1,100.00
$1,050
$28,270.00
$26,985.1
$18,810.00
$17,955
$1,760.40
$0.00
$388.64
$0.00
$14,237.92
$1,000.00
$12,997.92
$120.00
$0.00
$90,923.03
ADDITIONAL
AMOUNT DUE
BASED ON
22 LOTS
$3,150.00
$150.00
$25.74
$161.33
$35.00
$60.00
$450.00
$50.00
$50.00
$1,285.00
$855.00
$1,760.40
$388.64
$120.00
$8,541
P
ObCELOPMENT FEE WORKSHEET
PROJECT: W'mdsor F~tet~ R~ised
DATE: 9/13/2001
Water Impact Fee:
Domestic Metar(s):
Irrigation Meter(s):
22 - 518 inch X 3/4 inch = 22
1 - 1 1/2 inch = 5
1 - 5/8 inch X 3/4 inch = I
Fimline Meter(s): 0 = 0
Total #: 28 ESU's ~} $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 24 Connections ~} $50.00 ea.
(Single family due pdor to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 22 Domestic Meter(s) @ $25.67
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) (~ $135.66
Total #: 1 Additional Irrigation Meter(s) ~ $25.67
Total #: 0 Fireline Meter(s) ~ $0.00
(100% due pdor to issuance of water meters)
Domestic Water Meter Depqsit Fee:
Total #: 22 Meter(s) @ $35.00 ea.
( 100% due pdor to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) ~ $30.00 ea.
(100% due pdor to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 22 ~ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 22 Connections ~ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 22 Lots ~ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$12,600.00
$1,200.00
$564.74
$135.66
$25.67
$0.00
$770.00
$80.00
$9,900.00
$1,100.00
$1,100.00
Park Fee (For Residential Developments Only):
Page I
DEVELOPMENT FEE WORKSHEET
Preliminary plat approved: After October 26, 1993
Park Development Zone:
22 Single-family Q $1,285.00 per lot
0 Multi-family ~ $1,285.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the C~/s ~ght-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light w~ll be assessed.
(100% due pdor to final acceptance of development)
Zone 2
$28,270.00
$0.00
$18,810.00
$1,760.40
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessmenL
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering DepartmenL
(2% of development cost required for private improvements)
(4% of development cost required.for public improvements)
$14,237.92
Page 2
PROJECT:
DATE:
ROADWAY
9/I.~2001
RQADWAY IMPACT FEE:
Sinai Fnmil~ De>m~hed "'
No. ~ni~
~velopment Uni~ ** 22.~
Ve~cle Mil~ ~r ~velopme~ U~t ** 2.85
F~ ~ Ve~cle Mile ***
Ro~y ~ F~ due - ~velopm~t U~) x
Vehicle Mil~ ~ ~vel~t U~t~ x ~ ~ VeMcle ~le) - ~ ~ $1~,810.~
: * (FigUre 2. Readv~y Impeet Fee Study)
· * (Table 3 - Rond~y Impact Fee Study)
· ** (Soh~dule 2, P~8~ 3 - Ro~d~ Iml~'t Fee Stud~)
$18
COPPELL OPTIMUM ASSETS LLC 1152
308 PARK MEAOOW WAY
_..._ . _-__,
PAY TO TH E
[~----] Frost National Bank
Copp~ll, Texas 7~019
"'OO 1, l, 5 ;hi, ': l, &L~OOOOR 31: