Waterside E P2-CS 921009 (2)The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
October 9, 1992
,t
Mr. Bill Anderson
Dan M. Dowdey & Associates
16250 Dallas Parkway, Suite 100
r on
A final inspection of the above referenced project has been confirmed by representatives of the
City of Coppell subject to the various maintenance agreements.
The drainage utility and paving has been verified and is in compliance with the City of Coppell
standard requirements. Erosion protection will also be maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter (October 9, 1993). Maturity
on the Erosion Control Bond will be two years from this letter (October 9, 1994).
Sincerely,
Larry Davis
Construction Inspector
cc: of bhc Wo
M. Shohre Dmeshmm~ Civil Engineer
Grag Jones, Acting Building Offici~
Phillip Cullum, Cullum Conmcfion
Greg Kdeg, Reb~n, ~c.
Robe~ Caudiil, Tis~ Paving Compmy
waterll I