Loading...
Waterside E P2-CS 920914COPPELL PUBLIC WORKS DATE: TO: FROM: RE: MEMORANDUM ..pte~er 14, 1.92 ~ Larry Davis, Construction Inspector 'l~l Howard Pafford, Water~t~na~£ ~ Punch List Items fo~ater Side Estates Phase As per our discussion I am sending this memorandum to your office in order to note punch list items on the above referenced project that have not been corrected. The following items remain deficient: 1) The valves located in the brick pavers at the intersection of Waterside and MacArthur need to be set. pavers will have to be installed before acceptance. The Please ensure these items are corrected and maintenance bonds and asbuilts are sent to Public Works prior to acceptance of this project. HLP/sm