Waterside E P2-CS 920811 COPPELL PUBLIC WORKS
av", on. r c.o /
Walk-through _.~rside Estates Phase II-A
Field personnel performed a fina~]/~iku{hrough on the
above referenced project and have found all water/sanitary sewer
items to be Corrected.
Please ensure that the related maintenance bonds and as-built
plans are sent to Public Works prior to acceptance of this
project.
HLP/dm
WATRSDE.HLP