Loading...
Waterside E P2-CS 920811 COPPELL PUBLIC WORKS av", on. r c.o / Walk-through _.~rside Estates Phase II-A Field personnel performed a fina~]/~iku{hrough on the above referenced project and have found all water/sanitary sewer items to be Corrected. Please ensure that the related maintenance bonds and as-built plans are sent to Public Works prior to acceptance of this project. HLP/dm WATRSDE.HLP