Loading...
Waterside E P2-CS 920810 (2)COPPELL PUBLIC WORKS DATE: TO: FROM: RE: August 10, 1992 Larry Davis, Construction Inspector l~/ Howard L. Pafford, Utilities Superintenden~ Walk-through Waterside Estates Phase II-A The following water/sanitary sewer related items were found to be deficient during this morning's walk through of the above referenced project. · ~Station 4 + 60.20 - Check bottom of manhole for _ /~/ infiltration. _1~.// Station 1 + 44.14 - Regrout (wipe) inside manhole ring. 3'/ Station 3 + 46.90 - Check invert for infiltration. ~/-'~ Station.4 + 28.34 - Regrout (wipe) inside manhole ring. g. IrrigatIon Service between lots 37 & 38 Block F - Turn lower curb stop up. Please ensure that each of these items are corrected prior to final acceptance of this project. Thanks. HLP/dm WATRSIDE.HLP