Loading...
Waterside E P2-CS 920810 (3)DATE: TO: FROM: RE: COPPELL PUBLIC WORKS August 10, 1992 Larry Davis, Construction Inspector Rey Gonzales, Street Superintendent~/ Waterside II- Walk Through Punch List Street Division staff performed a walk through of the above referenced project at 8:30 a.m. on 8/10/92. The following is a list of deficiencies found at the time of the walk through: Intersection of MacArthur and Waterside incomplete. Needs to be completed and ramps need to meet ADA guideline stan- dards. Coffer Dam needs to be removed. Ail end of road guardrail needs to be 21" high with reflective end of road tape as per construction standard details. Remove debris from in front of Line G (48" RCP). Deck plate is bowed, needs to be corrected, cannot have more than a 1/4" lip at sidewalk (ADA Guidelines). Sewer line cleanout needs 2' x 2' blockout on Chelsea Bay. .All drop inlets need throat sealed (*Note: All inlets are holding water due to what appears to be the lake level at this time). Guardrail is needed at the bridge which needs to be consistent with current standard construction details. Erosion control on overall project needed. Please make sure that all the parties involved receive a copy of this punch list. RG/bc STWTRS.RG CoDpell, Texas 75019 FAX MAIL C ;' . .OVI,R PAGE 732 DEFOREST RD. P.O. BOX 478 COPPELL, TEXAS 7503.9 FAX # (214) 393-7641] PLEASE DELIVER PAGES TO: NUMBER 0~' PAGES INCLUDING COVER SHEET) R EI~AI~KS: *If yOU do ]tot rece:i.ve ali. of I:h¢; pages, DJ. ease call back as soon as possible. Tolephone No#(214) 462-8495 and ask £o~: person sending this fax. . DATE 00×10 TIME 11:24 MESSAGE CONF I RMAT I ON TX-TIME 00'56" DISTANT STATION ID 214 393 0948 DATE:08×lO×9~ TIME:ll:~5 ID:COPPELL PUBLIC W MODE PAGES RESULT G3-S 00~ OK