Waterside E P2-CS 950901 Coppell,
Texas 75019
P.O. Box 478
CoppeR, Texas 75019
214-462..0022
September 1,1995
Mr. Randy Lockhart
Standard Pacific Homes
5525 MacArthur Blvd., Suite 580
Irving, TX 75038
RE: Waterside Estates III
Final Acceptance
Dear Sir:
A final inspection of paving and utilities for the referenced project has been confu'med by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Sincerely
Construction Inspector
cc: Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works
Howard Pafford, Utilities Superintendent
Per Birdsall, Interim Street Superintendent'
Greg Jones, Chief Building Official
~' Jeff Jones, Fire Marshal
Doug Stevens, Engineering Technician
Carter & Burgess
Austin Bridge & Road, Inc.
Cullum Construction Company, Inc.
fil¢/ldavis/watsdiii, fin