Loading...
Waterside E P2-CS 950901 Coppell, Texas 75019 P.O. Box 478 CoppeR, Texas 75019 214-462..0022 September 1,1995 Mr. Randy Lockhart Standard Pacific Homes 5525 MacArthur Blvd., Suite 580 Irving, TX 75038 RE: Waterside Estates III Final Acceptance Dear Sir: A final inspection of paving and utilities for the referenced project has been confu'med by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincerely Construction Inspector cc: Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works Howard Pafford, Utilities Superintendent Per Birdsall, Interim Street Superintendent' Greg Jones, Chief Building Official ~' Jeff Jones, Fire Marshal Doug Stevens, Engineering Technician Carter & Burgess Austin Bridge & Road, Inc. Cullum Construction Company, Inc. fil¢/ldavis/watsdiii, fin