Loading...
WA9801-CS 981019SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. IOE R. CARTER, P.E. GARY C. HENDRICKS, P.E, October 19, 1998 Mr. Murray All .E. Texas Depa ent of Transportation District 1 tility Engineer P.O. B 3067 Dal , Texas 75221 S.H. 121 Water Line: From: Sandy Lake Road To: 675-feet south of Corporate Drive Dear Mr. Allen: At the request of the City of Coppell, we are submitting this preliminary set of construction plans for the S.H. 121 Water Line project, from Sandy Lake Road to 675 feet south of Corporate Drive. This submittal is being made in advance the formal Notice of Proposed Installation on Controlled Access Highway (TxDot Form 1082), which the City will submit at a later date. The purpose of this preliminary submittal is to get the state 's determination concerning two alignment issues: It is our understanding the State' s Utility Accommodation Policy provides for communication facilities to be installed in the first 3-feet of right-of-way, with water and sewer lines to be installed between first 3 to 10 feet of the fight-of-way. Based on preliminary discussions with your office, we have set the water line alignment 10-feet inside the existing fight-of-way of S.H. 121. During our field surveys for this project, we noted a recently installed underground telecommunications line (fiber optic?) meandering up to and beyond 10-feet inside the existing fight-of-way. The location of the recently installed cable is shown on our construction plans in accordance with the new trench line we found. We believe this facility is owned by Co-serve Communications. Is there a Notice of Proposed Installation on file in your office for this facility and does it provide for a definite alignment? What recourse does the City have if this facility is in conflict with the Notice requirements you have on file? The City of Coppell has requested the State consider an aligmnent exception to the normal Utility Accommodation Policy for a portion of the proposed water line. Please refer to. The alignment exception is between water line station 19+80 and 22+39 as marked up on construction plan sheets 3 and 4 and is made in order to facilitate the construction of the water line across the drainage channel at the outfall of the 66-inch pipe culvert. The revised alignment will also minimize the removal of trees and ease maintenance of the water line in the future. Mr. Murray Allen, P.E. Texas Department of Transportation October 19, 1998 Page No. 2 Please clarify the permitted alignment of the Co-Serve telecommunications cable and review this request for an altemate alignment for the City's proposed water line. Please notify this office of your findings. We are available to discuss this project further at your convenience. Sincere . yours,