Loading...
Woodlands-CS 971006 COPPELL STI~.EE TS I~NTEI~CE ~ INSPECT'rC~ REPORT DATE: PROJECT: TO: INSPECTIO~ BY: October 6, 1997 Woodlands of Coppell Larrs[ Davis, Construction Inspector LarryMorton, Streets Division Listed below are Streets Division comments relative to the Maintenance Bond inspection: 1. Area at end of acceleration lane along Coppell Road holds water on east end. 2. Crack in pavement on Winding Hollow in front of %13; rout and seal. 3. Barrier-free ramps (wheelchair) on the corners of Winding Hollow and Dartmouth Lane; Dartmouth Lane and Manchester; Breckland Heights and Manchester Lane northeast and southeast corners; Breckland Heights and Newcastle east and west side; Breckland Heights and Winding Hollow south side. 4. Cracks in cul-de-sac of Manchester Lane, rout and seal; also curb broken up across from 106 Manchester Lane crack in road next to and south of 106 Manchester Lane and at Manchester Lane and Breckland Heights; cracks in road at 105 Manchester Lane; large crack in intersection of Breckland Heights and Winding Hollow. 5. Joint in curb on right turn lane off Coppell Road need to be refilled with sealant. Note: Ail areas are painted in white. MESSAGE CONFIRMATION 10/08/97 10:12 ID=CITY OF COPPELL DATE 10/08 S,R-TIME ~0'5~" DISTANT STATION ID MODE PAGES CITY OF COPPELL CALLING 03 RESULT OK ~0 I~ed~ Finished. Phone: (hml ROAD/ALI .k'IYS ~/~- Grid Employee~ map. Address: (wk). 1. fl'ype of material A. C~crete* 2~ of Problem D.Pfevious .... site has ~ B. Asphalt A. Holding water E. Roiling sUeet C. Gravel B. Pot hole F. Tree Roots D. Din C. Mud hole G. Other *Street Repair , Alley Repair , Sidewalk Repair Sq. Ft. Priority 1 2 or 3 Who caused the problem or who is responsible for the problem A. The city E. Another utility company B. The customer p. Stnt~_ of Texas C. The conu-actor G. Other D. The developer How were the repairs made: A. Cut out and blocked yes no B. If concrete - was k doweled and pinned with steel, yes no C. If asphalt - was site cleaned out 2 inch yes no D. If asphalt - was site dry yes no E. If asphalt - was site cleaned from dust or lose particles yes no F. If asphalt - was TAC added to all joihts, yes no G. If asphalt - was seal coat applied? yes no H. If site is asphalt or base, was it compacted with a yes no "Wacker Packer" or lumping lack?. I. Was a miler used yes no Note why did this problem occur A. Settling of site B. Poor construction C. Shoulder rolling off D. Turning radius E. Other Were barricades used yes or no Were barricades removed yes or no Barricades for Other Departments Were the customers informed yes or no Was door knocker left yes or no 7. Weather conditions A. Dr~ B. Wet C. Hot S. Does the ditch need deaned out: 9. Does the culvert need to be cleaned or replaced: 10. Do the brick ~ven need to be replaced: 11. Was there an accident/incident: 12. How many trips to do ta~k? D. Cold E. Other yes or no ye~ or no yes or no Signature Did you r~x~: yes or no A. Main Line valves Service Line Hydronce B.Watoc Tover C. S~mplee O. BqUilXnent 1.Backflow Zeno. Backflow Znmp. Bk~low Ce~--..DaCe Re--Cn.-~. Date Reason f~= ~ai!ure: A. Electrolysis 2. New cona=.'uc=ion A.LlneLocate B.Znopec~lon D.Excavetion C. Poor D. Other 6. Linc of safco7 equipment at site if applicable: A. ~ar=icades ~. Cones C. Tape D. Lights E. OCher Request for Serviceman: ' ' ?.If Mecer/Se--'vice Leik: Classify - City= A.Wa=er Leal ~b~nmi: O~M Fire plug flushing $.wal Water Metered: YII No S.If Meter Chm3ge Ouc: A.Old Mecer~ Readinq $.New Mecnr~ Reading Tote! ~&llons Vehicle/~q~Lpeenc Used Unit # H~lee Kcs =.Old Meter E.Type of work perfo~-~mdo= findingm: New Xecer Sine/Type 9.Zf miinline or deep eeL"v~ce repair, ~tiicr~J*,e c~ of pipe or service line and condition: ll.Lilc M&teriaLI Uled= 12.If you had aa accident/incident whale performing tale roqve~d you repoL-~ lc~ yen or so 13.Water Utilities Mter Lflepectlont ~il O~ fall ~ / /W SLgnacu~e~