Loading...
Woodlands-CS 950328March 28, 1995 HAP Engineering Gary Hobbs 1451 Empire Central, Suite Dallas, Texas 75247-4063 Development Fee Assessment Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the W~t~[I~LI~9~ Please make payment to the City of Coppell in the amount of ~ and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager CITY OF COPPELL DEVELOPMENT FEES Date: March 28, 1995 Project: Woodlands of Coppell TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 20,700.00 20,700.00 (100% due prior to Council Approval) Water Tap Inspection Fee 3,900.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 17,100.1210 17,100.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 3,800.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee 1,900.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 846.00 (100% due at Issuance of Water Meter) Water Meter Deposit 1,140.00 (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) 173.65 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee 557.39 (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee 48,830.00 48,830.00 (100% due prior to Council Approval) Street Escrow/Impact Fee 32,490.00 32,490.00 (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $131,472.04 $119,120.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. ESCRO~V / ROADWAY IMPACT FEE CALCULATIONS DATE: PROJECT: ESCROW: March 24, 1995 The Woodlands of Coppell Street Type P4D/6 Street Name/s Coppell Road Cost per Foot $160.00 Length of Adjacent Frontage 1275.97 ft. Escrow due = (Cost per Foot) x (Length of Adjacent Frontage) = $204A55.20 ROADWAY IMPACT FEE: Service Area # 4 * Category Residential** Land Use Single-Family Detached** Building Size N/A Development Units 38 D.U. Vehicle Miles per Development Unit 2.85** Fee per Vehicle Mile $300 Roadway Impact Fee = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $32,490.00 Amount due is the lesser of the Street Escrow or the Roadway Impact Fee. AMOUNT DUE: $32,490.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) COPPELL ENGINEERING MEMORANDUM DATE: TO: FROM: RE: March 23, 1995 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Woodlands of Coppell The following fees the referenced project. Water Impact Fee: 38 - 5/8" x 3/4" Domestic Meter/s = 38 ESU's 1 - 2" Irrigation Meter/s = 8 ESU's Total 46 ESU's ~ $450.00 ea = $20,700.00 100% due prior to Council approval of the final plat. Wastewater Impact 38 - 5/8" x 3/4" Domestic Meter/s = 38 ESU's Total 38 ESU's ~ $450.00 ea = $17,100.00 should be assessed and collected on 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 39 Connections ~ $100.00 each = $3.900.00 100% due prior to issuance of building permit for residential. the case of multi-family, commercial, retail, industrial, prior to issuance of meter). Sewer Tap Inspection Fee 38 Connections @ $100.00 each = $3,800.00 100% due prior to issuance of building permit. (Or in fee is due above (Residential only) Development Fees Page 2 Utility Final 38 lots @ lOO% due prior to issuance of building permit. Water Meter Fee {Domestic) Inspection Fee (All Development) $50.00/10t = $1.900.00 38 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $846.00 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 2" Irrigation Meter/s @ $173.65 ea 100% due prior to issuance of water meter/s. = $173.65 Water Meter Deposit (Residential) 38 Meters ~ $30.00 ea = $1,140.00 100% due prior to issuance of building permit. Irrigation Meter Deposit 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: 38 Residential Lots at $1,285.00 each = $48,830.00 Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall prior to Council approval of final plat. Park Zone 1, as identified in the Parks, Master Plan. be paid by the Developer These fees shall apply to Recreation and Open Space Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Development Fees P~ge 4 Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 5 STREET SIGN ASSESSMENT for Woodland of Coppell The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN No Parking Speed Limit Yield Stop Street Name Stop & Street Combo OTHER No outlet UNIT PRICE OUANTITY S53.10 $63.54 2 $58.56 1 $65.12 $11.60 6 $96.85 3 11.60 1 EXTENDED PRICE 127.08 58.56 69.60 290.55 11.60 Cost breakdowns may be obtained request. from TOTAL Public $557.39 Works by written DEVFEES.HLP Revised 1/14/94