Loading...
DR9401-CS 950405April 5, 1995 Mr. Chuck Sturges Devonshire Homeowners Association 132 Newport Drive Coppell, Texas 75019 RE: Devonshire/Shadow Ridge Drainage Project DR 94-01 Sidewalk Construction Dear Mr. Sturges: The City of Coppell recently awarded the construction contract for the channel separating Devonshire from Shadow Ridge along with the sidewalk construction basically contained on the Wilson Elementary School site. As per previous discussions with both the Devonshire Homeowners Association and the C.I.S.D., it is my understanding that the cost of the sidewalk will be a three way split between those two entities and the City of Coppell. The total cost of the sidewalk construction was $4,129.20. Based on our conversations, the split will be 50% for the Devonshire Homeowners Association, 25 % for the C.I.S.D., and 25 % for the City. Therefore, prior to the actual construction of the sidewalk please provide a check made payable to the City of Coppell in the amount of $2,064.60 and forward it to Alan Johnson, Finance Director. If you should have any questions concerning this issue please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer April 5, 1995 Mr. Buddy Echols Coppell I.S.D. 200 S. Denton Tap Road Coppell, TX 75019 RE: Devonshire/Shadow Ridge Drainage Project DR 94-01 Sidewalk Construction Dear Mr. Echols: The City of Coppell recently awarded the construction contract for the channel separating Devonshire from Shadow Ridge along with the sidewalk construction basically contained on the Wilson Elementary School site. As per previous discussions with both the Devonshire Homeowners Association and the C.I.S.D., it is my understanding that the cost of the sidewalk will be a three way split between those two entities and the City of Coppell. The total cost of the sidewalk construction was $4,129.20. Based on our conversations, the split will be 50% for the Devonshire Homeowners Association, 25% for the C.I.S.D., and 25 % for the City. Therefore, prior to the actual construction of the sidewalk please provide a check made payable to the City of Coppell in the amount of $1,032.30 and forward it to Alan Johnson, Finance Director. If you should have any questions concerning this issue please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer