Loading...
Windance Sub-LR 850906SOUT~VEISTIERN LABORATC~'I, IIES Dallas Oivimion Materials, environmental and geotechnical consultation, fundamental testing and analytical services P.O. Box 2~4227 ', 2575 Lone Star Drive ',' Dallas, Texas 75254 · 214/631-2700 Metro 263-1133 TESTING, INSPECTION & MATERIALS ENGINEERS Dallas. Texas September 6, 1985FileNo* 41255-02 TO Texas Paving Company Attn: Don Nordhof f 1006 E. Main Street Lewisville, Texas 75067 REPORT OF TESTS ON Lime Pulverization RECEIVED FROM Texas Paving IDENTIFiCATi0NMARKS Time Tech General Contractors Paving 449 Harris Coppell, Texas DateRec'~ 08/30/85 TEST FOR PULVERIZATION OF LIME-SOIL MIXTURES Reference: Texas State Department of Highways and Public Transportation 97?Standard Specifications for Construction of Highways, Streets and Bridcjes Item 260.4 Percent Percent Test Passing Min. Specified Passing No. Test Location 1-3/4" Sieve (%) Passincj Nb.4Sieve Min. Specified (%) Passing 1 Sta 2+50 100.0 100.0 64.2 60.0 2 Sta 0+80 100.0 100.0 68.4 60.0 These tests do comply with the specifications. Technician: W.C~ Glenn Copies to: 3-Texas Paving Company SOUTHWEST~:~ LABOR/y~tE,~icrc. / L ab. No. D55094 /cjh /~~T Rodney J./G~don, C.E. .