Windance Sub-LR 850813
GINN, INC. CONSULTING ENGINEERS UTILITY LINE INSPECTION,AND TESTING Project: Date: ~'/~ Diameter: START Time: Pres sure: Area: Length:/~'- ~' Plan PRESSURE TES? ,,,' FINISH Time: Pressure: /~-/~. Line:, ~// Sheet No: Allowable Leakage Per Day: (ll.b~ gpd) X (.d~4miles of pipe) Gallons Lost Per,Daz: ( ~6-- Gal. Lost) ! ( Passed: CONNENTS: '~.~-~ ~,~ X (~_~inch Diameter) ,Hrs. Tested) X 24 Hrs. Rejected: ~,/~V Time: START INFILTIO, TION/EXFI, LTRATION TEST FINISH Time: Allowable Leakage Per Day: (250 gpd) X ( miles of pipe) X ( inch Diameter) Gallons Lost Per Day: ( Gal. Lost) ~ ( Hrs. Tested) X 24 Hrs. = Passed: Rejected CONNENTS: Tested Performed By: 2L~'~aaf/~/'~/'-7~.~,t~ 13740 Midway Road · Suite ?d)2 a Dallas. Texas 75234a Phone 214/386-6611