Waterside E P2-CS 911231COPPELL PUBLIC WORKS
~IEMORANDUM
DATE:
TO:
FROM:
RE:
December 31, 1991
Shohre Daneshmand, Acting City Engineer
Public Works Staff
Development Fees for Waterside Estates Phase II
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
132 - 5/8" x 3/4"
(Does not include Irrigation)
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
132 ESU's
ESU's
ESU's
Total 132 ESU's ~ $650.00 ea = $85,800.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee: (MUD)
132-5/8" x 3/4" Domestic Meter/s = 132 ESU's @ $225.00 = $29,700.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
132 Connections ~ $100.00 each = $13,200.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
132 Connections @ $I00.00 each = $13,200.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
132 Residential Lots at $150.00 each = $19,800.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
DEVELFE3.HLP
for
STREET SIGN ASSESSMENT
Waterside Estates No. 2
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIG~ UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
OTHER
No Outlet
53.10
63.54 11 $ 698.94
58.56 2 117.12
65.12
11.60 4 46.40
96.85 9 871.65
$ 58.56 2 $ 117,12
TOTAL $1,851.23
* Cost breakdowns may be obtained from Public Works by written
request.
Revised 4/1/91
DEVELOPMENT FEES
PROJECT NAME: Waterside Estates II Phase II
ENGINEER: Dan M. Dowdey
REV SION DATE: 1/17/94
SENT
1/27/92
4/22/93
5/13/93
7/16/93
7/19/93
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Paving Inspection
Irrigation
Const. Inspect. (Sidewalk)
Street Escrow
Street Cut Permit
Overtime Inspection
Overtime Inspection
Overtime Inspection
Overtime Inspection
Grading Inspection
Erosion Control
ASSESSED FEE AMOUNT PAID DATE
$5,100.00 $ 5,100.00 4/22/92
$44,200.00 $44,200.00 4/22/92
$15,300.00 $15,300.00 4/22/92
$989.23 $989.23 4/22/92
$2,926.00 $2,926.00 7/17/92
$3,862.50 $3,862.50 2/12/93
$4,548.34 $4,548.34 4/8/93
$7,095.00 $7,095.00 * 8/4/92
$144.76 $144.76 7/23/93
$232.00
$116.00
$232.00
$116.00
$316.84
$2,500.00
Total Fees
TOTALS $87,678.67
$232.00 5/11/93
$ 116.00 6/29/93
$232.00 7/19/93
$116.00 8/2/93
$316.84 9/16/92
$2,500.00 8/19/92
Fees Paid Amount Owed
$87,678.67 $0.00
(w/plans)
2/15/93
2/9/92
5/2/92
NOTES
Waterside II Phase II fees were seperated from Phase I
Irrigation fees were paid including: Impact, deposit, inspection,and meter
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Cont. Plan Recd.
Irrigation Plan Recd.
Homeowner's Maint.
7/22/93
7/30/93
7/30/93
5/12/92
8/17/93
7/22/93
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Maint. Escrow-Sidewalk ($148.49)
Erosion Control Escrow ($1,250.00)
MAINTENANCE BONDS
Bethel Harris
Big Cedar Addition
Country Estates
Chaucer Estates
Gibb Station Phase One
Riverchase Estates
Lakewood Estates Tract A
Waters Edge
Village at Cottonwood Creek, Phase IV
Lakewood Estates Tract B
Waterside Estates No. 2 Phase II
Parks of Coppell
Huntington Ridge
Stonemeade Estates
Riverchase Drive II & III
Eagle Point Village at Riverchase
Devonshire Phase II
Waterside Estates No. 2 Phase I
Villages of Coppell IIIB
Villages of Coppell IVB
Chautauqua Place
Fairways at Riverchase
TYPE MAINT. PERIOD ENDS
P,U 1/5/94
P,U 1/5/94
P,U 1/5/94
P,U 1/29/94
P,U 2/1/94
P,U 2/15/94
P,lJ 3/3/94
P,U 5/24/94
P,U 6/2/94
P,U 6/30/94
P, U 7/30/94
SidewMk Escrow 7/30/94
P,U 9/13/94
P,U 9/13/94
P,U 9/13/94
P,U 9/21/94
P,U 9/22/94
Erosion Control 9/21/94
Erosion Control 10/9/94
Erosion Control 11/4/94
Erosion Control 11/4/94
Erosion Control 12/10/94
P,U 12/10/94