Waterside E P2-CS 911231COPPELL PUBLIC WORKS ~IEMORANDUM DATE: TO: FROM: RE: December 31, 1991 Shohre Daneshmand, Acting City Engineer Public Works Staff Development Fees for Waterside Estates Phase II The following fees should be assessed on the above referenced project. Water Impact Fee: 132 - 5/8" x 3/4" (Does not include Irrigation) Domestic Meter/s = Irrigation Meter/s = Fireline Meter/s = 132 ESU's ESU's ESU's Total 132 ESU's ~ $650.00 ea = $85,800.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: (MUD) 132-5/8" x 3/4" Domestic Meter/s = 132 ESU's @ $225.00 = $29,700.00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 132 Connections ~ $100.00 each = $13,200.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 132 Connections @ $I00.00 each = $13,200.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 132 Residential Lots at $150.00 each = $19,800.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works DEVELFE3.HLP for STREET SIGN ASSESSMENT Waterside Estates No. 2 The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIG~ UNIT PRICE QUANTITY EXTENDED PRICE No Parking Speed Limit Yield Stop Street Name Stop & Street Combo OTHER No Outlet 53.10 63.54 11 $ 698.94 58.56 2 117.12 65.12 11.60 4 46.40 96.85 9 871.65 $ 58.56 2 $ 117,12 TOTAL $1,851.23 * Cost breakdowns may be obtained from Public Works by written request. Revised 4/1/91 DEVELOPMENT FEES PROJECT NAME: Waterside Estates II Phase II ENGINEER: Dan M. Dowdey REV SION DATE: 1/17/94 SENT 1/27/92 4/22/93 5/13/93 7/16/93 7/19/93 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Paving Inspection Irrigation Const. Inspect. (Sidewalk) Street Escrow Street Cut Permit Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Grading Inspection Erosion Control ASSESSED FEE AMOUNT PAID DATE $5,100.00 $ 5,100.00 4/22/92 $44,200.00 $44,200.00 4/22/92 $15,300.00 $15,300.00 4/22/92 $989.23 $989.23 4/22/92 $2,926.00 $2,926.00 7/17/92 $3,862.50 $3,862.50 2/12/93 $4,548.34 $4,548.34 4/8/93 $7,095.00 $7,095.00 * 8/4/92 $144.76 $144.76 7/23/93 $232.00 $116.00 $232.00 $116.00 $316.84 $2,500.00 Total Fees TOTALS $87,678.67 $232.00 5/11/93 $ 116.00 6/29/93 $232.00 7/19/93 $116.00 8/2/93 $316.84 9/16/92 $2,500.00 8/19/92 Fees Paid Amount Owed $87,678.67 $0.00 (w/plans) 2/15/93 2/9/92 5/2/92 NOTES Waterside II Phase II fees were seperated from Phase I Irrigation fees were paid including: Impact, deposit, inspection,and meter Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Cont. Plan Recd. Irrigation Plan Recd. Homeowner's Maint. 7/22/93 7/30/93 7/30/93 5/12/92 8/17/93 7/22/93 Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Maint. Escrow-Sidewalk ($148.49) Erosion Control Escrow ($1,250.00) MAINTENANCE BONDS Bethel Harris Big Cedar Addition Country Estates Chaucer Estates Gibb Station Phase One Riverchase Estates Lakewood Estates Tract A Waters Edge Village at Cottonwood Creek, Phase IV Lakewood Estates Tract B Waterside Estates No. 2 Phase II Parks of Coppell Huntington Ridge Stonemeade Estates Riverchase Drive II & III Eagle Point Village at Riverchase Devonshire Phase II Waterside Estates No. 2 Phase I Villages of Coppell IIIB Villages of Coppell IVB Chautauqua Place Fairways at Riverchase TYPE MAINT. PERIOD ENDS P,U 1/5/94 P,U 1/5/94 P,U 1/5/94 P,U 1/29/94 P,U 2/1/94 P,U 2/15/94 P,lJ 3/3/94 P,U 5/24/94 P,U 6/2/94 P,U 6/30/94 P, U 7/30/94 SidewMk Escrow 7/30/94 P,U 9/13/94 P,U 9/13/94 P,U 9/13/94 P,U 9/21/94 P,U 9/22/94 Erosion Control 9/21/94 Erosion Control 10/9/94 Erosion Control 11/4/94 Erosion Control 11/4/94 Erosion Control 12/10/94 P,U 12/10/94