WA9801-CS 981012October 12, 1998 Gary Hendricks, P.E. Shimek, Jacobs & Finklea Engineers 8333 Douglas Avenue ~820 Dallas, Texas 75225 ~: S.H. 121 Water Line Project # WA98-01 Dear Mr. Hendricks: The City of Coppell appreciates the timeliness of the initial plan submittal of the water line along S.H. 121. I have reviewed the plans and offer the following comments: 1. Approximately the first 650' of the water line is adjacent to and contained within an existing drainage ditch. The flow line of that ditch should be shown in the profile view to insure that the water line is sufficiently deep to be constructed without causing a problem to the ditch or the water line. 2. A 20' section of pipe should be stubbed out at the valve as the water line turns north at approximately Sta. 6+34. Actually, the 90° turn should be relocated to approximately Sta. 6 + 54 and the pipe stubbed out 20' west of that. 3. The City would like to suggest that TxDOT be approached about installing the water line in a different location from approximately Sta. 19+00 to Sta. 23+00. Because of the drainage features, power poles, trees, etc., it is our opinion that the line would be better served to be relocated closer to the northbound service road and go over the top of the existing drainage features. If the line is to remain as currently shown, a 12" valve should be provided on each side of the water line before it goes under the drainage ditch. 4. An air valve should be provided at approximately Sta. 26 + 50. 5. Blow-offs should be provided at approximately Sta. 21 + 10 and 43 +62. 6. The construction plans for S.H. 121 Business Park show an existing valve at approximately Sta. 43 + 85. Please verify whether or not that valve exists. If not, there needs to be a valve added as the new water line is installed. 7. Future Freeport Parkway is proposed at approximately Sta. 40+75. Please insure the proposed 12" water line is deep enough to avoid relocation in the future when the street is extended. 8. Additional fire hydrants should be provided at approximately Sta. 19+00, 31+00 and 41+60. 9. Future Royal Lane is proposed at approximately Sta. 23 +00. Please insure the proposed 12" water line is deep enough to avoid relocation in the future. 10. The crossing on Sandy Lake should be bored as opposed to open cut. There are various other comments throughout the plans that should also be addressed. As you are aware, this is a fast track project with the need to be installed and in operation by approximately June 1999. Any help in expediting the changes, notification to utility companies and permits from TxDOT would be appreciated. Should you have any questions, please feel free to contact this office at your convenience. Sincerely, K ffi P.E. Director of Engineering and Public Works projects~VA98-01/shimik SHIMEK, JACOBS & FINKI,EA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue,#820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOttS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER. P.E. GARY C. HENDRICKS, P.E. L C. FINKLEA, P.E. September 18, 1998 Mr. Kenneth M. Crfiffm, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: S.H. 121 Water Line Preliminary Construction Plans Dear Mr. Gfiffin: We are enclosing two sets of preliminary construction plans for the S.H. 121 Water Line, from Sandy Lake Road to Corporate Drive. These plans are approximately 75 percent complete and are for your initial review and comment. We have set the alignment of the water line 10-feet inside the easterly right-of-way of S.H. 121. This alignment is based on discussions we had with Mr. Murray Allen, P.E. of the Texas Department of Transportation, District 10 office. We have noted on the plans the location of a fiber optic cable recently installed along this corridor. In some locations the fiber optics cable appears to "wander" within the fight-of- way and may be in conflict with the alignment we have set. Mr. Allen indicated the fiber optic cable was scheduled to be constructed within the first 3 feet of the right-of-way. We obviously have some coordination issues to work out with the fiber optic owner. Other items not yet resolved: -~ These plans have not yet been sent to the utility companies. b) Wehaven~tyetpreparedtheTxD~T``N~tice~fPr~p~sed~nsta~~ati~n--C~ntr~~~edA~~ess~~permit application. c) We have located fire hydrants only at the high points on the water line. Will the City prefer air and vacuum release valves at these locations? Do you want to include additional fire hydrants at this time? d) We have shown 12-inch line valves near the fire hydrants at the high points. This works out to one line valve every 1,200 feet or so. Please review and comment. e) The plans are currently shown to open cut Sandy Lake Road at the S.H. 121 intersection. You may want to have us bore this crossing. Mr. Kenneth M. Griffin, P.E. City of Coppell September 18, 1998 Page No. 2 f) Are we to use the North Central Council of Government Standard Specifications for Public Works Construction for the project specifications? g) Are we to use the City of Coppell Standard ConsInaction Details for this project? After this initial review, we will prepare a second review set which will include the project specifications and estimated quantifies. We will also forward the plans to the utility companies and prepare the highway permit at that time. We are available to discuss this project further at your convenience. Enclosures L~cfi' H~ckse~~