Loading...
DR9401-CS 941128November 28, 1994 J.C. Main Construction, Inc. 6816 Ha~onson N. Richland Hills, Texas 76108 :: Sha ow , e onshire ra na e Impro' Bid hQ 1194-01 ~>~'~' .......................... Dear Sir: The City of Coppell will be accepting bids on the at 10:00 a.m., at which time they will be publicl~ The Scope of Work is generally as follows: This project shall generally consist of th concrete chapel (approximately 235 C.Y. of concrete). It shall also include the excavation and recompaction of about 275 C.Y. of di~ and the excavation and haul off of about 75 C.Y. of di~. The work shall be as shown on the construction plans (DR 94- 01) and shall consist of ~rnishing all labor, equipment, tools and incidentals necessau to complete the work as described in the plans and specifications. For additional info~ation, please feel free to contact Jim Ragsdill, ~rchasing Agent at (214) 462-~22 or myself at (214) 393-1016. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Dir. of Public Works/City Engineer cc: Jim Ragsdill, Purchasing Agent file/kgriffin/DR 9401/spec. Itt ,,"~----7,1~, The City With A Beautiful Future Coppell, Texas 75079 ,~_~/, 2t 4-462-0022 November 28, 1994 J.C. Main Construction, Inc. 6816 Harmonson N. Richland Hills, Texas 76108 RE: Shadowridge/Devonshire Drainage Improvement Project DR 94-01 Bid gQ 1194-01 Dear Sir: The City of Coppell will be accepting bids on the referenced project prior to December 29, 1994 at 10:00 a.m., at which time they will be publicly opened and read. The Scope of Work is generally as follows: This project shall generally consist of the construction of about 1020 linear feet of concrete channel (approximately 235 C.Y. of concrete). It shall also include the excavation and recompaction of about 275 C.Y. of dirt and the excavation and haul off of about 75 C.Y. of dirt. The work shall be as shown on the construction plans (DR 94- 01) and shall consist of furnishing all labor, equipment, tools and incidentals necessary to complete the work as described in the plans and specifications. For additional information, please feel free to contact Jim Ragsdill, Purchasing Agent at (214) 462-0022 or myself at (214) 393-1016. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Dir. of Public Works/City Engineer cc: Jim Ragsdill, Purchasing Agent file/kgriffin/DR 9401/spec.ltr Comractors: Burkard Utility Contractors 2621 Country Valley Road Garland, TX 75043 Fax 214 271-1078 Murray Construction Co., Inc. 515 N. Kealy Street Lewisville, TX 75057 Fax 219-0019 Linder-Stahl 3809 1/2 Modlin Ave. Fort Worth, TX 76107 Craig Olden, Inc. P.O. Box 1500 Little Elm, TX 75068 J.C. Main Construction, Inc. 6816 Harmonson N. Richland Hills, TX 76180 Contractors: Burkard Utility Contractors 2621 Country Valley Road Garland, TX 75043 Murray Construction Co., Inc. 515 N. Kealy Street Lewisville, Texas 75057 Linder-Stahl 3809 1/2 Modlin Ave. Fort Worth, TX 76107 Craig Olden, Inc. P.O. Box 1500 Little Elm, TX 75068 J.C. Main Construction, Inc. 6816 Harmonson N. Richaland Hills, TX 76180 Humphrey & Morton Construction Company 5136 Vesta Farley Fort Worth, TX 76181 Gunite Construction 7112 Richland Road Fort Worth, TX 76118 Andrews Gunite, Inc. 2326 1-35 North Carrollton, Texas 75006 LEROY HESS CHRIS CAGLE PRESTIGE GUNITE 860 DAVIS BLVD. KELLER, TX 76248 (817) 379-6871 DON VOGLE GUNITE, INC. 2206 SHADOW CREEK CT. SOUTHLAKE, TX 76092 (214) 484-4812 DAN GOPLIN DAN'S SHOTCRETE MCKINNEY, TX 75069 (214) 516-1748 "'~"'V' P.O. BOX 695 MANSFIELD, TX 76063 (817) 477-2435 /~/ /~,/'~--"1 Ttqe City With A Beautiful Future Coppell, Texas ".5019 November 28, 1994 Andrews Gunite, Inc. 2326 1-35 North Carrollton, Texas 75006 RE: Shadowridge/Devonshire Drainage Improvement Project DR 94-01 Bid #Q 1194-01 Dear Sir: The City of Coppell will be accepting bids on the referenced project prior to December 29, 1994 at 10:00 a.m., at which time they will be publicly opened and read. The Scope of Work is generally as follows: This project shall generally consist of the construction of about 1020 linear feet of concrete channel (approximately 235 C.Y. of concrete). It shall also include the excavation and recompaction of about 275 C.Y. of dirt and the excavation and haul off of about 75 C.Y. of dirt. The work shall be as shown on the construction plans (DR 94- 01) and shall consist of furnishing all labor, equipment, tools and incidentals necessary to complete the work as described in the plans and specifications. For additional information, please feel free to contact Jim Ragsdill, Purchasing Agent at (214) 462-0022 or myself at (214)393-1016. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Jim Ragsdill, Purchasing Agent filelkgriffin/WA 9401/spec.ltr