Waterside E P2-CS 930722 (4)DAb ... DOWDEY AND A,~$OCIATIES, IhG.
01VIL ENGINEERS
16250 DALLAS PARKWAY SUITE 100
DAL~8, T~8 752~
(~14) 98~-~ F~ (2~4) 981-9S~
July 22, 1993
Mr. Ken Griffin, P. E.
City Engineer
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Erosion Control
Waterside Estates No.2
Phase Two
Dear Ken~
Per Larry Davis' request, I have estimated the =cst of the silt
fence on this project. The total linear footage is approximately
925 L.F. The unit cost is $1.35/L.F. The total cost is $1248.75.
the check written by Standard Pacific of Texas is $1250.00 I
understand that this money is in an escrow fund for two years and
will be refunded ko the developer two years after .the final
acceptance of the development.
Sincerely,
William A. Anderson,
WAA; Jrb
Standard Pacific of Texas, Inc.
5525 MAC ARTHUR BLVD., SUITE 580 PH. 214-550-0426
iRVING, TEXAS 75038
2675
7/22 .19 93 32-97/1H0
One thousand, two hundred, fifty & NO/100
PAY
TO
THE
ORDER
OF
City of Coppell
DOLLARS $1,250.00
"'OO2&75"' I:;;;oooq?3': ."52&OOO~h~a"'
.mAm~''''~. INC. DETACH AND RETAIN THIS STATEMENT
STANDARD
PACIFIC
OF
DELUXE FORM WVO-4 V-4744
DISTRtBUTIONS
DATE DESCRIPTION AMOUNT
ACCT 'NO AMOUNT
7/22/93 Escrow;money for Waterside Estates Phase II - ;rosion Cont:'ol
52/117 0024 1,250.00