Loading...
Waterside E P2-CS 930722 (4)DAb ... DOWDEY AND A,~$OCIATIES, IhG. 01VIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DAL~8, T~8 752~ (~14) 98~-~ F~ (2~4) 981-9S~ July 22, 1993 Mr. Ken Griffin, P. E. City Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Erosion Control Waterside Estates No.2 Phase Two Dear Ken~ Per Larry Davis' request, I have estimated the =cst of the silt fence on this project. The total linear footage is approximately 925 L.F. The unit cost is $1.35/L.F. The total cost is $1248.75. the check written by Standard Pacific of Texas is $1250.00 I understand that this money is in an escrow fund for two years and will be refunded ko the developer two years after .the final acceptance of the development. Sincerely, William A. Anderson, WAA; Jrb Standard Pacific of Texas, Inc. 5525 MAC ARTHUR BLVD., SUITE 580 PH. 214-550-0426 iRVING, TEXAS 75038 2675 7/22 .19 93 32-97/1H0 One thousand, two hundred, fifty & NO/100 PAY TO THE ORDER OF City of Coppell DOLLARS $1,250.00 "'OO2&75"' I:;;;oooq?3': ."52&OOO~h~a"' .mAm~''''~. INC. DETACH AND RETAIN THIS STATEMENT STANDARD PACIFIC OF DELUXE FORM WVO-4 V-4744 DISTRtBUTIONS DATE DESCRIPTION AMOUNT ACCT 'NO AMOUNT 7/22/93 Escrow;money for Waterside Estates Phase II - ;rosion Cont:'ol 52/117 0024 1,250.00