Waterside E P2-CS 930805COPPELL PUBLIC ~
MEMOI~ANDUM
DATE: August 5, 1993
TO:
FROM:
RE:
Steven G. Goram, Director of Public Works
Sheri Moino, Services Coordinato~
Waterside 2, Phase II Maintenance Bonds/Asbuilts
(Tickler 8/19/93)
Attached are the maintenance bonds for Waterside Estates, Phase
II. The asbuilts have also been received and have been indexed
accordingly.
This should end tickler.
/sm