Loading...
Amberpoint BP 2R-LR060104FIELD DENSITY TESTING Report Number: 94051418.0027 Service Date: December 27, 2005 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: Januar~,~"7-zo0§ ~ Project: ,-~mherPgint Business Par~ Buildings 4, 5 and § 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Material Laboratory No. Test Method Description and Classification Lab Test Data Pmiect Requirements Optimum Max. Lab Water Dry Unit Water Minimum Dry Content Weight Content Unit Weight (%) (pc0 (%) (% compaction) 1. 514180003 ASTM D 698 Reddish brown sandy clay 14.8 112.3 >/= +3 93 Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elevation No. (inches) Building #4, Building Pad Moisture Conditioned 184 60' N & 25' W of SE corner SG 1 6 185 100' N & 45' W of SE comer SG 1 6 186 175' N & 90' W of SE corner SG 1 6 187 250' N & 60' W of SE corner SG 1 6 188 325' N & 75' W of SE corner SG 1 6 189 400' N & 35' W of SE corner SG 1 6 190 475' N & 50' W of SE comer SG 1 6 191 550' N & 80' W of SE corner SG 1 6 Datum: SG = subgrade Water Dry Unit Dry Unit Content Weight Weight (%) (pct~ (% compaction) 21.7 104.2 93 20.1 107.4 96 22.0 140.0 100+ 19.9 108.0 96 21.0 105.3 94 22.7 104.1 93 21.6 105,0 93 20.5 106.0 94 Comments: Test results on this report meet project specification. Services - Perform in-place density and moisture content tests to determine degree condition. GaugeField TestiD: Method~,STM35367 D2922, ASTM D3017p/.lI('"~'~// ,/~- Technician: Carlos D. Dotson Field Results Reported To: Superintendent (1) O*Brien & Assoc (1) TechniStructures Report Distribution: (1) Transwestern Commercial Se~ices (1) Cily of Coppell TX (1) Cily of Coppell TX (1) Rogem O*Brien Construction Co Reviewed by: and matedal moisture The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Hussein/ ~. Abusaad, P.E. Senior Project Manager WATER INJECTION OBSERVATION ll' rr con (214) 630-1010 Date of Service: Client No.: Client: Location: 01/04/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #5, see attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0037 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers O'Brien Construction Comp~ Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 6th No. of Probes: 4 per rig/3 rigs on-site Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: 1. Jowell, the injectors were not maintaining 18 inch intervals. 2. Jowell, the injectors could not inject 7 feet in some areas because it was too hard. Mainly on the southeast comer of the building pad. Field Results Report To: Technician: J. James Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99pdt (1) Rogers O"Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wrillen approval of Terracon. WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Sketch: 01/04/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #5 Report No.: Project No.: Project: 94051418.0037 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Note to Scale 1 170' 1 · 720' · Hard I S PaSS ~6 " Building #5 W E 150' ~_ _~ · 200' ~ ~ N 99pdr This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon.