Loading...
WA9701-CS060106 (2)CO??ELL January6,2006 John Skinner J.T. Dersner, Inc. 1032 W. Pioneer Pkwy #400 Arlington, TX 76013 RE: Belt Line / Denton Tap 16-1nch Water Line Project #WA 97-01 Dear Mr. Skinner: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Friday, December 23, 2005 (Holiday). The overtime rate including salary and benefits is $54.00 per hour. A total of seven hours was charged to your company for that date. Please send a copy of this letter along with your check for $378.00, payable to the City of Coppell to the following address: City of Coppell Finance Department Attn: Jennifer Armstrong, Finance Director P.O. Box 9478 Coppell, TX 75019 If you should have any questions, please contact me at (972) 304-3679. Sincerely, Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304~3570 cc: Finance Department OVERTIME WORKSHEET Date /2 Address /Vff ~ City/State/Zip Dear In accordance with your request, inspection service was provided by the City of Coppell Engineering Dept. at the referenced location on Sunday, ,2005 The overtime rate including salary and benefits is $54.00 per hour, with a minimum charge of four hours. '~' hours were charged to ),our company on that date. Please send a check for $ ff/Tt~2t OD payable to the City of Coppell to the following address: City of Coppetl Finance Dept. Attn: Jennifer Armstrong PO Box 9478 Coppell, TX 75019 If you have any questions, please contact me at 972/304-7090. Rick O'Dell Construction Inspector