Amberpoint BP 2R-CS051220Rogers-O'Brien Construction Co.
Amber Point Buildings 4,5,&6 Job Site
200 Northpoint
CoppelL TX 75019
Phone: Fax:
Letter of Transmittal
TO: Coppell;City of Date: 12/20/2005
ATTN: Larry Davis Job: 05028 Amber Point Buildings 4,5,&6
255 Parkway
Coppell, TX 75019 Transmittal #: 24
Phone: (972) 304-3684
Fax: (972) 304-3570
Subject: Re-Issue of Civil Drawings
Type of Delivery:
WE ARE SENDING YOU
F Shop drawings
F- Copy of letter
C' Attached
r- Prints
r- Change order
Under separate cover via None the following items:
Plans I- Samples
Specifications t- Other
Document Type Copies Date
Contract Documents ,,~ ~
THESE ARE TRANSMITTED as checked below:
NO.
Approved as submitted
Approved as noted
Returned for corrections
r- Other
Description
C2.01, C3.03-3.09, C4.01 and C4.02
Resubmit __ copies for approval
Submit __ copies for distribution
Return __ corrected prints
For approval
For your use
As requested
For review and comment
C~ FOR BIDS DUE fi' PRINTS RETURNED AFTER LOAN TO US
Remarks: If you have any staff on site, copies of the above drawings have been issued to them directly.
From:
Signature:
Copy To:
Bob Britton (Rogers- O'Brien Construction)
If enclosures are not as noted, kindly notify us at once.
Page 1 of t