Loading...
Park West CC(02-2)-LR051230CO~ER TEST REPORT Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 167 REG PROJECT NO. 12466 SAMPLE DATE: 12-02-05 TECHNICIAN: D. Gazley PAGE: 1 of 1 Location of Sample Set Number I Location 1 Paving: 90'S, 15'W of NW corner of Bldg. B 2 Paving: 410'S, 18'W of NW corner of Bldg. B i Quantity Represented 50/150 100/150 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 8205 4000 Test Results Set Cylinder Age @ Total Load Compressive Average No. ID Date Tested Test lbs. Strength p.s.i. Stren~lth p.s.i. 1 6382 12-09-05 7 93440 3310 6382 12-30-05 28 / 135140 4780 6382 12-30-05 ~'~/ 2j,8,.. ,¢ 128200 4540 4660 6382 Hold ~ 27([ ~04~ 3~0 2 6383 12-09-05 6383 12-30-05 6383 12-30-05 28 156110 5690 6383 Hold H Cylinder Data Set Cylinder Time ~" ~ I Concrete Air Ticket No. I ID i Slump iSar~ ~ Temp. I Temp. iEntrainment Number 1 6382 6.0 7'~/ ~ 30 48 5.2 165578 I 2 6383 6.0 ~.Z~r' ~r 34 58 3.8 165633 Mail Submitted by: Distribution: (1) Cadence Mc~hqne C bration/ Mr. Bobby Par~N,,.~ ~,,~'] REED ENGINEERING GROUP, LTD. (1) Commerce Cons~['Fuction C~, Mr RickW ,y. y ~d,,r~ ~ fjl/~°rieina' signed By (1) City of Coppell/Mr.~L i ....... III (1) City of Coppell/Mr/Lee,/~,t~ne ~r/tr ¢.r[nur b~ne~r, ly, (1) Northwestern Investment Mgmt.~/ i.v~.n, ager, uMT Mr. Ernest Willmore At-linc (1)Stewart Consulting Associates/ Mr. Mike Smith 2424 STUTZ DR · SUITE 400 · DALLAS, fX 75235 · TEL [214] 3505600 · F^X [214] 3500019