Park West CC(02-2)-LR051230CO~ER TEST REPORT
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 167
REG PROJECT NO. 12466
SAMPLE DATE: 12-02-05
TECHNICIAN: D. Gazley
PAGE: 1 of 1
Location of Sample
Set Number I Location
1 Paving: 90'S, 15'W of NW corner of Bldg. B
2 Paving: 410'S, 18'W of NW corner of Bldg. B
i Quantity Represented
50/150
100/150
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
TXI 8205 4000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Stren~lth p.s.i.
1 6382 12-09-05 7 93440 3310
6382 12-30-05 28 / 135140 4780
6382 12-30-05 ~'~/ 2j,8,.. ,¢ 128200 4540 4660
6382 Hold ~ 27([ ~04~ 3~0
2 6383 12-09-05
6383 12-30-05
6383 12-30-05 28 156110 5690
6383 Hold H
Cylinder Data
Set Cylinder Time ~" ~ I Concrete Air Ticket
No. I ID i Slump iSar~ ~ Temp. I Temp. iEntrainment Number
1 6382 6.0 7'~/ ~ 30 48 5.2 165578
I 2 6383 6.0 ~.Z~r' ~r 34 58 3.8 165633
Mail Submitted by:
Distribution: (1) Cadence Mc~hqne C bration/
Mr. Bobby Par~N,,.~ ~,,~'] REED ENGINEERING GROUP, LTD.
(1) Commerce Cons~['Fuction C~,
Mr RickW ,y. y ~d,,r~ ~ fjl/~°rieina' signed By
(1) City of Coppell/Mr.~L i ....... III
(1) City of Coppell/Mr/Lee,/~,t~ne ~r/tr ¢.r[nur b~ne~r, ly,
(1) Northwestern Investment Mgmt.~/ i.v~.n, ager, uMT
Mr. Ernest Willmore At-linc
(1)Stewart Consulting Associates/
Mr. Mike Smith
2424 STUTZ DR · SUITE 400 · DALLAS, fX 75235 · TEL [214] 3505600 · F^X [214] 3500019