Park West CC(02-2)-LR051222 REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Parer
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 170
REPORT DATE: 12-22-05
REG PROJECT NO. 12468
DATE OBSERVED: 12-07-05
TECHNICIAN: D. Rico
PAGE: 1 of 1
Items Observed:
Building A access ramp: Line AA to A from 20.6 to 21.
Reference Plans or Notes Used: I Sheets S1.0, S2.2 and S3.2
I x 1There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1
Cadence McShane Corporation/
Mr. Bobby Paret
(1 Commerce Construction Co., LP/
Mr. Rick Wyly
(I City of Coppeil/Mr. Larry Davis
(1 City of Coppell/Mr. Lee Stone
(1 Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/rs
2424 STUTZ DR * SUITE 400 · DALLAS, TX 75235 · TEL [214] 3505600 · F^X I214] 3500019