Loading...
Park West CC(02-2)-LR051222 REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Parer CONTRACTOR: Cadence McShane Corporation REPORT NO. 170 REPORT DATE: 12-22-05 REG PROJECT NO. 12468 DATE OBSERVED: 12-07-05 TECHNICIAN: D. Rico PAGE: 1 of 1 Items Observed: Building A access ramp: Line AA to A from 20.6 to 21. Reference Plans or Notes Used: I Sheets S1.0, S2.2 and S3.2 I x 1There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1 Cadence McShane Corporation/ Mr. Bobby Paret (1 Commerce Construction Co., LP/ Mr. Rick Wyly (I City of Coppeil/Mr. Larry Davis (1 City of Coppell/Mr. Lee Stone (1 Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR * SUITE 400 · DALLAS, TX 75235 · TEL [214] 3505600 · F^X I214] 3500019