Park West CC(02-2)-LR051216CONCRETE CYLINDER TEST REPORT
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14660 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Parer
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 153
REG PROJECT NO. 12468
SAMPLE DATE: 11-18-05
TECHNICIAN: D. Balderas
PAGE: 1 of 1
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 75'N, 38'W of SW corner of Bid9. A 40/80
Specified Strength p.s.i.
Design Information
Source of Concrete I Mix Identification
TXI 8205 4000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. I ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
6107 11-25-05 7 93620 3310
6107 12-16-05 28 132530 4690
6107 12-16-05 28 133360 4720 4710
6107 Hold H
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. I ID Slump Sample Air Temp. Temp. Entrainment Number
1 6107 5.75 4:12AM 46 66 5.4 158240
Mail
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyiy
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewad Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Arthur Etherly, III
Manager, CMT
AE/Inc
2424 STUTZ DR * SUITE 400 " DALLAS, TX 75235 · TEL [214] 350 5600 · fAX [214] 350 0019