Loading...
ST9902-CS060113T H E C I T Y O F COPPELL Janua~,'13,2006 Robert Caudill Tiseo Paving Company, Inc. 419 E. Hwy 80 Mesquite. TX 75105 RE: West Sand>, Lake Road Project # ST 99-02A Concrete Mix Design Submittals [)ear Mr. Caudill: The City of Coppell has received notice from Teague, Nail & Perkins that three of the mix designs submitted do not meet our minimum requirements for this project. See the attached letter for details on what difl'ers from your submittals and our project requirements. Please · resubmit designs tbr these mixes for consideration. In addition to concrete mix submittals, the three items at the bottom of the letter should also be provided for consideration as soon as possible. If you have an3' questions or need any additional information, please feel free to contact me. Sincerely, Larry l~avis Construction Inspector Office: 972/304-3684 Fax: 972/304-3570 Suzan Taylor, CIP Coordinator Matt Atkins, P.E., Teague, Nall& Perkins Attachment TEAGUE NALL AND PERKINS ENGINEERS · SURVEYORS · CONSULTANTS Memorandum To: From: Date: Re: Keith Marvin, P.E. Matt Atkins, P.E. 1-12-06 West Sandy Lake Phase 1 - Contractor Submittals Attached are the submittals from Tiseo Paving that were submitted at the pre-construction meeting. TNP has reviewed these submittals only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. The submittals appear to be in general conformance with the following exceptions: 1. Redi-Mix #724 5-Sack Mix Design. Thi__s mix does not m?_.¢~he__minimum requirement~ for any concrete to be used on this project. It ~s ~ndlcated to be used on Concrete Flatwork, but the requirements for that use is a minimum of 5.5-Sacks and 3600 psi. 2. Latimore Materials #1261 5-Sack Mix Design. This mix does not meeI the minimum requirements for any concrete to be used on this p~-oject. It is indicated to be used on Concrete Flatwork, but the requirements for that use is a minimum of 5.5-Sacks and 3600 psi. 3. Southem Star #9616 5 Sack Class A Mix Design. This mix dogs nnt -~,~,~t the minimum requirements for any concrete to be used on this proj'~ct. It is indicated to be used on Concrete Flatwork, but the requirements for that use is a minimum of 5.5-Sacks and 3600 psi. The following is a list of items that still need to be submitted by the contractor according to the Contract Documents or the list of submittals in Section II of the Preconstruction C.~Trerence Agenda: attic Control Plan showing each phase. Precast box culvert and RCP design and details. The submittal list indicated that there was a Letter of Certification for RCP from Hanson Pipe & Products. However, TNP could not find this letter in the submittal folder. ,~. Batch Plant - air quality control, scare certification, letter of permission. 12160 North Abrams Road · Dar[as, Texas 75243 · 214.461.9867 phone · 214.461.9864 fax