Loading...
Vista Point II 3-7-CS060112COFFELL January 12,2006 Mr. Ken Newman, President Scott & Reid General Contractors 15303 N Dallas Pkwy//150 Addison TX 75001 RE: Vista Point II/Lots 3, 4, 5, 6 & 7, Block A Final Acceptance Pending Dear Mr. Newman: Based on walk-thru inspections conducted in early December 2005, all punchlist items appear to be complete except for general clean-up of the site, sidewalk completion and pavement repair on Forest Hill Drive. There was some discussion of delaying the sidewalk until development of the individual lots, but no final resolution has been reached. It is apparent that your construction project has caused pavement damage in the street adjacent to the south properly line, on Forest Hill Drive. Please arrange to have the damage repaired to City of Coppell standards as soon as possible. Also, please forward a copy of any final acceptance or punchlist from City of Lewisville concerning work within their city relative to this project. hr addition, final acceptance of the project requires as-buih plans from the engineer of record and maintenance bonds for paving and utility installations. Please call me if you have any questions about these requirements. Sincerely, KeithR. Marvin, P.E. Assistant City Engineer Office Phone: (972) 304-7044 Fax:(972) 304-3570 cc: David Solomon, City of Lewisville