Denton Tap 1A-CS060106COFPELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Interim FireChief
Larry Davis, Construction Inspector L-~ Jx~ ~5
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date:
RE:
January 6, 2006
WALK-THRU for Wachova Bank
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for
Monday, January 9, 2006 at 2:00 p.m.
Please let me know ifI can be of further assistance.
cc: Claude Bolton, Centex Construction