Loading...
Amberpoint BP 2R-LR060111REPORT OF SOIL-LIME MIXTURE PULVERIZATION 'l rracon Date of Service: Client No.: Client: 01/11/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0062 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Contractor: Test Location: Rogers-O'Brien Construction Building #4 560' x 90' 210'S of NW comer Test Method: NTCOG Specification Requirements: Minimum Passing 1-3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist 1-3/4" SIEVE #4 SIEVE TEST LOCATION % PASSING % PASSING NO. 1 Approximately 60' E & 240' S of NW comer of Building #4 100 62 2 Approximately 120' E & 270' S of NW comer of Building #4 100 63 3 Approximately 180' E & 300' S of NW comer of Building #4 I00 67 4 Approximately 240' E & 240' S of NW comer of Building #4 100 72 5 Approximately 300' E & 270' S of NW comer of Building #4 100 70 6 Approximately 360' E & 300' S of NW comer of Building # 100 63 7 Approximately 420' E & 240' S of NW comer of Building #4 100 75 8 Approximately 480' E & 270' S of NW comer of Building #4 100 62 9 Approximately 540' E & 300' S of NW comer of Building #4 100 71 10 Approximately 560' E & 240' S of NW comer of Building #4 100 65 Comments: Technician: D. Drogos Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1} City of Coppell TX 309pr (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStmctures Hussein H. Abusaad, P.E. Senior Project Manager l rracan WATER INJECTION OBSERVATION (214) 630-1010 Date of Service: 01/11/06 Report No.: Client No.: 50854 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 94051418.0058 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Location: Building #6, see attached sketch General Contractor: Rogers-O'Brien Injector: Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Per Rig/3 Rig On-site Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Suffactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: 1. The injector, Jowell did not get the 7 feet depth in several locations because the ground was too hard. 2. The injector, Jowell did not get refusal in each location because they were rushing their drops of 18 inch intervals. Field Results Report To: Technician: J. Johnson Report Distribution: (1) Tmnswestem Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99pdr (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon. WATER INJECTION OBSERVATION ] ffacon 8901 Carpenter Fnay., Suite #100 Dellas, Texas 75247 Date of Service: Client No.: Client: Location: 01/11/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #6 Report No,: Project No.: Project: General Contractor: 94051418.0058 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien 420' · 1/11/06 Building #6 pass #3 1/11/06 Pass #4 S ~-so!'~ E 170' This report is exclusively for the use of the client indicated above ar~l shall not be reproduced in full without written approval of Terracon. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0036 Service Date: January 3, 2006 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 7,5244 refracon 8901 Carpenter Frv~, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: January 11, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: Supplier: Lattimore Truck No: 1106 Mix I.D. No.: 1261 Plant: 3 Ticket No: 3206902 ~ormation Sample Time: 3:30pm Date Cast: January 3, 2006 Technician: Carlos D. Dotson Weather Conditions: Clear Accumulative Yards: 3 Placement Method: Direct Discharge Sample Locations: Inlet at Lateral F-2, Sta. 0+12.79 Placement Location: Inlet at Lateral F-2, Sta. 0+12.79 Field Test Data Test Result Slump, inches: 4.00 Air Content, %: 3.1 Concrete Temperature,° F: 71 Ambient Temperature, o F: 66 Plastic Unit Weight, pcf: 141.6 Laboratory Test Data set specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 1 4 Services - Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Date Test Tested (days) 01/10/2006 7 01/10/2006 01/31/2006 01/31/2006 Maximum Compressive Load Strength (lbs) (psi) 82,300 2,910 7 81,600 2,890 Average 2,900 28 28 Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Cados D. Dotson Report Distribution: ~ (1) Transw~stern Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX Hussein H. Abusaad, P.E. (1) Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actua~ samples tested at the location(s) referenced and are not necessarily indicative of the proper[les of other apparently similar or identical materials. Page 1 of 1